Amarillo, TX Building Safety: Building Inspections (2026)
Key Facts
- Governing section
- Amended IBC § 110.3, Amarillo Code § 4-3-1
- Inspection stages
- Sections 110.3.1 through 110.3.12
- Re-inspection fee trigger
- Set by City Council resolution, § 109.7
- Appeals body
- Construction Advisory and Appeals Board Commission
- Prerequisite
- Property corners surveyed before any inspection
Summary
Amarillo's amended Building Code requires the building official to inspect construction at each of twelve staged checkpoints set out in Section 110.3, from site survey through final approval, and lets the city charge a re-inspection fee whenever a scheduled inspection fails to go forward. Appeals go to the Construction Advisory and Appeals Board Commission.
[A]110.3 Required inspections. The building official, upon notification, shall make the inspections set forth in Sections 110.3.1 through 110.3.10 110.3.12. No inspections shall be made on new construction until the site has been surveyed and all property corners have been physically identified.
[A]109.7 Re-inspection fee. A fee, as established by city council resolution may be charged when: 1.The inspection called for is not ready when the inspector arrives.2.No building address or permit card is clearly posted.3.City approved plans are not on the job site available to the inspector.4.The building is locked or otherwise not accessible for/ to the inspector.5.The jobsite receives a "Correction required Notice"6.Failure to maintain erosion control, trash control, or tree protection. Any re-inspection fees assessed shall be paid before any more inspections are made on that job site
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 81).
Full Breakdown
Section 4-3-1 of the Amarillo Municipal Code adopts the International Building Code and amends its administrative provisions. 12 and bars any inspection on new construction until the site has been surveyed and all property corners physically identified. 6, so lath, gypsum board and gypsum panel product inspections must occur after the material is in place but before plaster is applied or joints are taped and finished, with no carve-out for non-fire-rated assemblies. 7 lets the city charge a re-inspection fee, set by City Council resolution, whenever the called-for inspection is not ready when the inspector arrives, no address or permit card is posted, approved plans are not on the job site, the building is locked or otherwise inaccessible, the job carries an open correction-required notice, or erosion control, trash control, or tree protection was not maintained.
Any assessed re-inspection fee must be paid before the city will schedule another inspection on that job. 1, referenced in Chapter 2-6 of the Municipal Code; an appeal must claim the code's true intent was misapplied, a provision does not fully apply, or an equivalent or better construction method is proposed, and the board cannot simply waive a requirement outright.
Violations & Fines
Missing or failing a scheduled inspection triggers a re-inspection fee under Section 109.7, set by City Council resolution, before any further inspection is scheduled on the site. Common triggers include an inspector arriving to find no posted address or permit card, a locked or inaccessible building, missing approved plans, an outstanding correction-required notice, or lapsed erosion, trash, or tree-protection controls. Appeals of the building official's determinations go to the Construction Advisory and Appeals Board Commission under Section 113.1, which can only pass on code interpretation, not waive requirements.
Frequently Asked Questions
What inspections does Amarillo require during construction?
Does Amarillo charge for a missed or failed inspection?
Can I appeal a building official's inspection decision?
Sources & Official References
Other rules in Amarillo
Texas rules heatmap·Compare Amarillo to another location·View the Texas building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.