Key Facts

One/two-family dwelling inspections
7 required
Large/complex project increase
up to 50% more inspections
Re-inspection fee
$15 per missed call
Foundation rule
no concrete without prior inspection
Violation fine
$50 to $500 per offense

Summary

Clark County requires inspections at set stages of every permitted building project in the unincorporated county, with a fixed schedule by construction type. Concrete, electrical, mechanical, plumbing and insulation work cannot be covered until the Building Commissioner signs off, and missed inspections cost $15 each.

These county ordinances apply to unincorporated areas of Clark County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

After the issuance of any building permit, the Building Commissioner shall make, or shall cause to be made, inspections of the work being done as are necessary to ensure full compliance with the provisions of this chapter and the terms of the permit. ... (B) For any unusually large or complex buildings or structures, the Building Commissioner shall have the power to increase the number of required inspections by 50%. ... (D) No concrete shall be placed for foundations without prior inspection. (E) No electrical, mechanical, plumbing or thermal insulation work shall be covered without prior inspection. (F) Where additional inspections are required due to failure of permit holder to have work ready for inspection at a designated stage of construction, the Building Commissioner shall have the power to assess a re-inspection fee of $15 for each such additional inspection.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2019 S-0: Code: Local legislation current through Ordinance 31-2014, passed 12-18-2014).

Full Breakdown

11, the Building Commissioner must inspect permitted work as necessary to confirm compliance with the Building Code and the permit terms. The ordinance sets a minimum inspection count by project type: 3 inspections for accessory buildings and for additions/alterations, 5 for mobile homes and temporary structures, and 7 for one- and two-family detached dwellings, apartments/hotels/motels (per unit), commercial and public buildings, educational and institutional buildings, and industrial or warehouse buildings. For unusually large or complex projects, the Building Commissioner can raise the required inspection count by 50%.

The Commissioner sets the stage of construction at which each inspection must be called for, and two hold points are mandatory regardless of project size: no concrete may be poured for foundations without a prior inspection, and no electrical, mechanical, plumbing or thermal insulation work may be covered before it is inspected. If a permit holder fails to have the work ready when an inspection is called and an extra trip is required, the county charges a $15 re-inspection fee, payable to the County Plan Commission.

12 requires the Building Commissioner to review the application for code compliance, for flood safety of the proposed site, and for compliance with the Chapter 153 floodplain rules. 14 whenever work departs from the approved permit or code.

Violations & Fines

Under § 151.99(B), violating §§ 151.01-151.18 (which includes the inspection requirements) carries a fine of not less than $50 nor more than $500 per violation, plus attorney fees and court costs, with each day of continued noncompliance a separate offense. Starting construction without first obtaining the required permit adds a flat $100 fine, collected when the late permit application is filed, on top of double the normal permit fee.

Frequently Asked Questions

How many inspections does a new single-family home need in Clark County?
Seven, per the schedule in § 151.11(A) covering one- and two-family detached dwellings. Additions and accessory buildings need only three, while mobile homes and temporary structures need five.
Can the county require extra inspections beyond the schedule?
Yes. Under § 151.11(B), the Building Commissioner can increase the required number of inspections by 50% for any unusually large or complex building or structure.
What happens if my project isn't ready when the inspector arrives?
The county can charge a $15 re-inspection fee for every additional trip caused by the permit holder not having the work ready at the designated stage, payable to the County Plan Commission under § 151.11(F).
Can I pour my foundation before the county inspects it?
No. Section 151.11(D) prohibits placing concrete for foundations without a prior inspection, and (E) similarly bars covering electrical, mechanical, plumbing, or insulation work before it is inspected.

Sources & Official References

Other rules in Clark County

All Clark County rules

Compare Clark County to another location·View the Indiana building safety overview

Get notified when Building Inspections in Clark County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.