Skip to main content
CityRuleLookup

Collierville, TN Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Inspecting officer
Code Compliance Officer, under § 31.49
Refused entry
Officer can seek a warrant under Tennessee law
Final inspection
No occupancy until approved (energy code C105.2.6)
Rough Electric
Load calculations due as part of or before inspection
Backflow tests
Results on site at time of inspection
Appeals body
Construction Board of Adjustments and Appeals

Summary

In the Town of Collierville, the Code Compliance Officer can enter property to check compliance with the Town Code and zoning ordinance, and a building under the energy code cannot be occupied until its final inspection is approved. Refusal of entry leads to a warrant under Tennessee law.

The Code Compliance Officer is authorized to enter upon any property or premises to ascertain whether the provisions of the Town Code, zoning ordinance, subdivision regulations, design standards manual and other related codes enforced by the Town are being obeyed and to make any examinations and surveys as may be necessary in the performance of their enforcement duties. These may include the taking of photographs, samples or other physical evidence. All inspections, entries, examinations and surveys shall be done in a reasonable manner. If an owner, occupant or agent refuses permission to enter or inspect, the Code Compliance Officer may seek a warrant as provided under Tennessee law to gain access to the property. ... C105.2.6 Final inspection. ... The building shall have a final inspection and shall not be occupied until approved. The final inspection shall include verification of the installation and proper operation of all required building controls.

Full Breakdown

Section 31.49 of the Collierville Code of Ordinances authorizes the Code Compliance Officer to enter any property or premises to find out whether the Town Code, zoning ordinance, subdivision regulations, design standards manual and related codes are being obeyed. The officer can make the examinations and surveys needed for enforcement, including photographs, samples or other physical evidence. Every inspection, entry, examination and survey must be done in a reasonable manner. If an owner, occupant or agent refuses permission, the officer can seek a warrant under Tennessee law. Section 31.47 adds that field inspections cover buildings, structures and land, and that the officer keeps records of all code violations, investigations and permits issued.

The officer has no discretion to bend the rules. Section 31.50 bars changes to the codes or variances from their terms, and § 31.51 requires issuing a permit when the applicant meets the code conditions, even if the work conflicts with private restrictive covenants.

Building-stage inspections appear inside the adopted technical codes. Under § 150.100(C), the Town's amended energy code provision C105.2.6 requires a final inspection, bars occupancy until the building is approved, and includes verification that all required building controls are installed and operate properly. The amended electrical code in § 150.080 requires branch circuit load calculations as part of or before the Rough Electric inspection, and requires a Town of Collierville electrical inspection or an engineer to verify a concrete-encased electrode before concrete is placed. Backflow preventers under the plumbing and residential code amendments must be tested by a Tennessee-certified individual, with results on site at the time of inspection.

Permit holders must also meet § 150.305: electrical, plumbing, mechanical and gas permits go only to a business entity with a Tennessee license or an individual with a Shelby County master tradesman license. Decisions by the code official on the energy code can be appealed to the Town of Collierville Construction Board of Adjustments and Appeals.

Violations & Fines

Violating a Town ordinance carries a fine of not more than $50 or the maximum state law allows, whichever is greater, for each offense, with each day a separate offense (§ 150.999). Occupying a building before final inspection approval breaches energy code C105.2.6. A refused inspection leads the Code Compliance Officer to seek a warrant.

Frequently Asked Questions

Can Collierville code officers enter my property to inspect?
Yes. Section 31.49 authorizes the Code Compliance Officer to enter property or premises to check compliance with the Town Code, zoning ordinance and related codes, and to take photographs, samples or other evidence. All entries must be reasonable. If an owner, occupant or agent refuses permission, the officer can seek a warrant under Tennessee law.
Can I move into a new building before the final inspection?
No under the energy code. Section 150.100(C) amends C105.2.6 so the building must have a final inspection and cannot be occupied until approved. The final inspection includes verification of the installation and proper operation of all required building controls.
What inspection comes with electrical work in Collierville?
Section 150.080 requires branch circuit load calculations as part of or before the Rough Electric inspection. A concrete-encased electrode must be verified by a Town of Collierville electrical inspection or by an engineer before concrete is placed. Permits for electrical work go only to licensed entities or individuals under § 150.305.
Can an inspector waive a code requirement?
No. Section 31.50 says the Code Compliance Officer cannot make changes in the Town Code or vary its terms. Section 31.51 also bars refusing a permit when the applicant meets the code conditions, even if the work would conflict with private restrictive covenants.

Sources & Official References

Other rules in Collierville

All Collierville rules

Compare Collierville to another location·View the Tennessee building safety overview

Get notified when Building Inspections in Collierville, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Nearby Cities

How other cities in this county handle building inspections.

Memphis, TN
Some Restrictions