Penn Hills, PA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Inspection stages
5, initial through final
Notice required
24 hours before inspection
Who to notify
Director of Code Enforcement
Governing code
Penn Hills Code § 1424.08

Summary

Penn Hills, Pennsylvania requires permit holders doing grading, excavation, or fill work to schedule inspections at five defined stages, from initial site work through final completion, giving 24 hours' notice each time.

The permit holder shall notify the Director of Code Enforcement in order to obtain inspections in accordance with the following schedule and such notification shall be made by the permit holder at least 24 hours before the inspection is to be made:

(a) Initial Inspection. When work on the excavation or fill is about to be commenced;

(b) Rough Grading. When all rough grading has been completed;

(c) Drainage Facilities. When drainage facilities are to be installed and before such facilities are backfilled;

(d) Special Structures. When excavations are complete for retaining and crib walls and when reinforcing steel is in place and before concrete is poured; and

(e) Final Inspection. When all work, including the installation of all drainage and other structures, has been completed. If, at any stage of the work, the Municipal Engineer determines by inspection that the nature of the formation is such that further work as authorized by an existing permit is likely to endanger any property, street or alley, or create hazardous conditions, the Engineer may suspend operations. The Engineer may require, as a condition to allowing the work to continue, that the permit holder take reasonable safety precautions to avoid such likelihood of danger. Safety precautions may include, but are not limited to, specifying a flatter exposed slope and construction of additional drainage facilities, berms, terracing, compaction, cribbing or walls.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4434863; v5 updated 2025-07-21; through 07-21-2025).

Full Breakdown

Under the Municipality of Penn Hills Grading Ordinance, a grading, excavation, or fill permit holder in Allegheny County must call the Director of Code Enforcement for inspection at each of five stages: initial inspection before work begins, rough grading, installation of drainage facilities, retaining or crib wall construction, and final inspection once all work and drainage structures are complete. The permit holder must give at least 24 hours' notice before each inspection and bears the inspection cost.

Violations & Fines

Skipping a required stage inspection, or failing to give the Director of Code Enforcement 24 hours' notice before work proceeds, lets the Municipal Engineer halt the job until the omitted inspection is completed and approved.

Frequently Asked Questions

How much notice do I need before a grading inspection in Penn Hills?
At least 24 hours, given to the Director of Code Enforcement, under Code § 1424.08.
What are the required inspection stages for grading work?
Initial inspection, rough grading, drainage facilities, special structures, and final inspection.

Sources & Official References

Other rules in Penn Hills

All Penn Hills rules

Compare Penn Hills to another location·View the Pennsylvania building safety overview

Get notified when Building Inspections in Penn Hills, PA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Nearby Cities

How other cities in Allegheny County handle building inspections.

Pittsburgh, PA
Some Restrictions