Skip to main content
CityRuleLookup

Pompano Beach, FL Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Enforcing official
Floodplain Administrator / Building Official
Lowest-floor certificate
Sealed by Florida-licensed surveyor
Timing
Before further vertical construction proceeds
Final certificate
Submitted at final inspection
Manufactured homes
Separate Building Official inspection track
Missing certification
Presumed a code violation
Enforcement forum
Special Magistrate, Code Enforcement, Ch. 162 F.S.

Summary

Pompano Beach requires floodplain-permitted construction to pass inspection by the Floodplain Administrator, including a lowest-floor elevation certificate before vertical framing continues and a final elevation certificate at closeout. Missing certification is presumed a code violation until corrected.

(A) General. Development for which a floodplain development permit or approval is required shall be subject to inspection. ... (D) Buildings, structures and facilities exempt from the Florida Building Code, lowest floor inspection. Upon placement of the lowest floor, including basement, and prior to further vertical construction, the owner of a building, structure or facility exempt from the Florida Building Code, or the owner's authorized agent, shall submit to the Floodplain Administrator the certification of elevation of the lowest floor prepared and sealed by a Florida licensed professional surveyor. (E) ... final inspection. As part of the final inspection, the owner or owner's authorized agent shall submit to the Floodplain Administrator a final certification of elevation of the lowest floor.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-122: Supplement contains: Local legislation current through 2026-35, passed 7-29-26).

Full Breakdown

26, any development requiring a floodplain development permit or approval is subject to inspection. For development other than buildings and structures, the Floodplain Administrator inspects to confirm compliance with the Floodplain Regulations and the conditions of the issued permit. For buildings, structures and facilities exempt from the Florida Building Code, the Floodplain Administrator also inspects for compliance. 26(D) sets the key construction-stage checkpoint: once the lowest floor, including any basement, is placed, and before any further vertical construction proceeds, the owner or the owner's authorized agent must submit a certification of the elevation of the lowest floor to the Floodplain Administrator, prepared and sealed by a Florida-licensed professional surveyor.

26(E) then requires a second, final certification of the lowest floor elevation submitted as part of the final inspection before the project closes out. 26(F): the Building Official inspects the installation, and elevation certification for the lowest floor still has to reach the Floodplain Administrator or Building Official. These inspection checkpoints exist because Pompano Beach sits in mapped flood hazard areas and ties construction sign-off to verified elevation data rather than self-reported plans. 27.

Violations & Fines

Section 152.28 treats a building lacking documented lowest-floor elevation or other required design certification as presumed in violation until the owner supplies and the Building Official or Floodplain Administrator approves the missing paperwork. The Floodplain Administrator can issue a notice of violation or a stop-work order to the owner, the owner's agent, or whoever is performing the work, and continuing work after a stop-work order is itself a separate violation. The city prosecutes these cases before its Special Magistrate for Code Enforcement under F.S. Chapter 162, in County Court, or through any other relief a court can grant.

Frequently Asked Questions

Who inspects floodplain construction in Pompano Beach?
The city's Floodplain Administrator inspects development requiring a floodplain permit, and the Building Official separately inspects manufactured homes placed or replaced in flood hazard areas, per Code of Ordinances Section 152.26. Both roles confirm compliance with the Floodplain Regulations and the conditions attached to the issued permit before work can proceed or close out.
When is the lowest-floor elevation certificate due?
As soon as the lowest floor, including any basement, is placed and before any further vertical construction happens, the owner or an authorized agent must submit a certification of the lowest floor's elevation to the Floodplain Administrator. Section 152.26(D) requires that certification be prepared and sealed by a Florida-licensed professional surveyor.
Is there a second certification at the end of construction?
Yes. Section 152.26(E) requires a final certification of the lowest floor elevation submitted to the Floodplain Administrator as part of the final inspection, separate from the earlier lowest-floor certificate submitted during framing.
What happens if the elevation certificate is never filed?
Section 152.28 presumes the building is in violation once documentation of the lowest-floor elevation or other required certification is missing, and that presumption stands until the paperwork is provided and approved. The Floodplain Administrator can issue a notice of violation or a stop-work order, and the city can prosecute before its Special Magistrate for Code Enforcement under Chapter 162, F.S.

Sources & Official References

Other rules in Pompano Beach

All Pompano Beach rules

Florida rules heatmap·Compare Pompano Beach to another location·View the Florida building safety overview

Get notified when Building Inspections in Pompano Beach, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Nearby Cities

How other cities in Broward County handle building inspections.

Hollywood, FL
Some Restrictions
Pembroke Pines, FL
Some Restrictions
Fort Lauderdale, FL
Some Restrictions
Miramar, FL
Significant Restrictions