Key Facts

Inspecting officer
Building officer, Dept. of Community Development
Box check survey
Required before footer/slab inspection
Address posting
4-inch numbers before permitted work starts
Continuing past inspection
Requires written release first
Final inspection
Required before certificate of occupancy

Summary

Once a building permit is issued in unincorporated Spalding County, the building officer inspects the work at intervals throughout construction and again at completion, under Code § 8-1006(8). A contractor cannot move past the point marked by one inspection to the next phase of work without first getting a written release from the Department of Community Development, and a final inspection is required before any certificate of occupancy or completion is issued.

These county ordinances apply to unincorporated areas of Spalding County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(8)Inspections.(a)Existing building inspections. ... They shall inspect all buildings, structures, electrical, gas, mechanical, and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. ... (d)Inspections prior to issuance of certificate of occupancy or completion. The building officer shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building, structure, electrical, gas, mechanical, or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion. ... (g)Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical, or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the director of the department of community development or their designee.

Full Breakdown

Spalding County's inspection process runs alongside the building permit system created by Ordinance No. 2025-77 on July 7, 2025. Section 8-1006(8)(a) has the building officer inspect a building or its electrical, gas, mechanical, or plumbing systems during and upon completion of work for which a permit was issued. Section 8-1006(8)(c) lets the director of the Department of Community Development accept reports from recognized outside inspection services once satisfied of their qualifications, though any certificate based on those reports must rest on a written, signed report from a responsible officer of that service.

Before the footer, slab, or foundation wall inspection can be approved, § 8-1006(8)(e) requires the owner or their agent to submit a location survey, called a box check, sealed by a Georgia-registered land surveyor or civil engineer confirming the structure's form boards match the setback lines in Appendix IV. Section 8-1006(8)(f) also requires the jobsite address to be posted in numbers at least four inches tall on a contrasting background before permitted work can start. Under § 8-1006(8)(g), a contractor cannot legally continue work past the point checked by any one of the successive inspections without a written release from the director of the Department of Community Development or a designee, and it is the contractor's or owner's job to clear away anything blocking a required inspection.

A final inspection under § 8-1006(8)(d) is required at every stage of construction and again at completion, before the county will issue a certificate of occupancy or completion.

Violations & Fines

Continuing work past an inspection point without the required written release under § 8-1006(8)(g) is treated as work performed in violation of the construction codes, an ordinance violation under § 8-1008 punishable under general law with each day counted separately. The building officer may also issue a stop-work order under § 8-1005(3) that takes effect immediately and states the conditions for resuming.

Frequently Asked Questions

What is a box check survey in a Spalding County building inspection?
It is a form location survey, sealed by a Georgia-registered land surveyor or civil engineer, confirming that a new structure's form boards are placed according to the setback lines in Appendix IV. Code § 8-1006(8)(e) requires it before the county will approve the footer, slab, or foundation wall inspection.
Can a contractor keep building after one inspection passes in Spalding County?
Only up to the point covered by that inspection. Section 8-1006(8)(g) requires a written release from the director of the Department of Community Development, or a designee, before work continues past each successive inspection stage, and the contractor must clear away anything blocking the next inspection.
Does Spalding County accept private inspection reports for permitted work?
The Department of Community Development may accept reports from a recognized outside inspection service under § 8-1006(8)(c), but only after investigating its qualifications and reliability, and only if the report is a written, signed report from a responsible officer of that service.

Sources & Official References

Other rules in Spalding County

All Spalding County rules

Compare Spalding County to another location·View the Georgia building safety overview

Get notified when Building Inspections in Spalding County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.