Key Facts

Final inspection
Contractor must call building official on completion
Pre-inspection condition
Fuses/breaker must be installed at final inspection
Approval method
Tag or label on service entrance switch
Certificate
Required before satisfactory completion is certified
Standing authority
Building official may inspect wiring any time

Summary

Once electrical work is finished, the contractor must call the building official for a final inspection under Sec. 6-136, with the fuses or breaker installed and no wiring concealed until it is approved. The official tags the work as approved or rejected, and Sec. 6-140 requires a certificate of inspection before the electric company may energize the installation.

Sec. 6-136. - Final inspection required. A final inspection by the building official shall be called by the person performing electrical work for which a permit has been issued on completion of such work. ... Sec. 6-138. - Approval tag. After inspecting any electrical wiring, the building official shall leave notice in the form of a tag or label attached to the service entrance switch, which notice shall clearly state whether the wiring is approved or is to be kept open for correction. ... Sec. 6-142. - Refusal of certificate of inspection. The building official is hereby given the authority to refuse to issue a certificate of inspection for any addition, or extension to any electric wiring in or on any building wherein the building official determines that the wiring is in an unsafe condition. ... Sec. 6-143. - Regular inspections. It shall be the right of the building official to inspect all electrical wiring and apparatus in the city at any time in order to ascertain whether such electrical wiring or apparatus is in any respect dangerous to life or property.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 88).

Full Breakdown

Chapter 6, Article III, Division 4 sets out Waco's electrical inspection sequence. Sec. 6-135 makes it unlawful to seal or conceal any electrical wiring until it has been approved. Once the permitted work is complete, Sec. 6-136 requires the person who performed the work to call the building official for a final inspection, and Sec. 6-137 requires the fuses in the main disconnect switch, or the breaker, to be in place at that final inspection. After inspecting, Sec. 6-138 requires the building official to leave a tag or label on the service entrance switch stating whether the wiring is approved or must be kept open for correction.

Sec. 6-140 then requires the building official to issue a certificate of inspection on satisfactory completion of the permitted work, certifying that it complies with the applicable rules. Sec. 6-141 addresses partial compliance: if new work is done correctly but connects to old, nonconforming work, the official issues a written statement that the new work complies while withholding the certificate for the system as a whole, itemizing the violations that block it. Sec. 6-142 lets the building official refuse a certificate of inspection outright if the wiring is unsafe or doesn't comply with the article, and bars any electric company from energizing that work.

Sec. 6-143 separately gives the building official standing authority to inspect any electrical wiring in the city at any time to check for danger to life or property, and to order defects corrected within a reasonable, specified time.

Violations & Fines

Concealing wiring before it is approved violates Sec. 6-135. If the building official refuses a certificate of inspection under Sec. 6-142 because the wiring is unsafe or noncompliant, no electric company may connect current to it. An owner who refuses or fails to correct a defect the building official identifies under Sec. 6-143's regular-inspection authority, within the time specified, is held in direct violation of the article.

Frequently Asked Questions

Who calls for the final electrical inspection in Waco?
Sec. 6-136 puts that duty on the person who performed the electrical work: once the permitted job is done, they must call the building official for a final inspection, and Sec. 6-137 requires the fuses or breaker to already be in place when the inspector arrives.
How do I know if my electrical work passed inspection?
Sec. 6-138 requires the building official to leave a tag or label on the service entrance switch after inspecting, stating clearly whether the wiring is approved or must be kept open for correction, and Sec. 6-140 requires a formal certificate of inspection on satisfactory completion.
Can the city inspect my wiring even without a new permit?
Yes. Sec. 6-143 gives the building official standing authority to inspect any electrical wiring in the city at any time to check for danger to life or property, and to order the owner to correct any defective or dangerous condition within a specified reasonable time.

Sources & Official References

Other rules in Waco

All Waco rules

Texas rules heatmap·Compare Waco to another location·View the Texas building safety overview

Get notified when Building Inspections in Waco, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.