Key Facts

Mandatory inspection stages
6, footing to final
Discretionary waiver threshold
cost under $2,500
First failed reinspection
free
Later reinspections
$90 fee
Probable-cause inspection trigger
20+ occupants or 4+ unit common areas

Summary

York County, Virginia's building code official runs six mandatory inspection stages on covered construction under County Code § 7.1-11(a), from footing trenches before concrete pours through a final inspection before any certificate of occupancy issues, all to confirm compliance with the Virginia Uniform Statewide Building Code.

These county ordinances apply to unincorporated areas of York County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)The building code official shall prescribe such inspections and surveys as may be necessary to secure compliance with the VUSBC, the Virginia Industrialized Building Safety Law and Manufactured Housing Construction and Safety Standards Law, and such other regulations as shall properly fall within the enforcement responsibility of the office of the building code official. Such inspections shall include but are not limited to:(1)The bottom of footing trenches after all reinforcement steel is set and before any concrete is placed.(2)Beams, floor joists, vents and anchor bolts before any subfloor is laid.(3)Structural framing and fastenings, prior to covering with concealing materials.(4)All electrical, mechanical and plumbing materials, equipment and systems prior to concealment.(5)Required insulating materials before covering with any materials.(6)Upon completion of the building, and before issuance of the certificate of occupancy, a final building inspection shall be made to ensure that any violations have been corrected and all work conforms to the VUSBC.

Full Breakdown

The required stages run in construction order: footing trenches after rebar is set but before concrete is placed; beams, floor joists, vents and anchor bolts before the subfloor goes down; structural framing and fastenings before they are concealed; electrical, mechanical and plumbing systems before concealment; required insulation before it is covered; and a final building inspection before the certificate of occupancy issues, confirming any earlier violations were corrected. The building code official may waive an inspection at his discretion when construction cost is under $2,500, per § 7.1-11(a)(7).

Under § 7.1-11(b) the permit holder or their representative must notify the building safety office when each stage is reached. Separately, § 7.1-11(c) lets the building code official inspect completed buildings on probable cause of a violation, including any building storing hazardous materials, any building occupied by 20 or more people, or the common areas of residential buildings with four or more units, coordinating those inspections with fire and health officials before an occupancy permit issues. Reinspection carries its own cost: § 7.1-9(f) sets a $90 reinspection fee whenever the inspector cannot get safe access, the site is not ready, or the address is not posted, though the first reinspection after a failed inspection is free.

Violations & Fines

Failing to schedule a required inspection, concealing work before it is inspected, or continuing work after a stop-work order violates Chapter 7.1 under § 7.1-59, with a fine up to the maximum permitted by § 36-106 of the Code of Virginia and each day of continued violation a separate offense. Beyond the first free reinspection after a failed check, § 7.1-9(f) charges $90 for each subsequent reinspection needed because the work still is not ready.

Frequently Asked Questions

What inspections does York County require before a certificate of occupancy?
Section 7.1-11(a) lists footing, framing, rough electrical/mechanical/plumbing, insulation and a final inspection as the required stages, with the final inspection confirming that any earlier violations were corrected and the work conforms to the Virginia Uniform Statewide Building Code.
Can a small York County project skip a required inspection?
Yes, at the building code official's discretion: § 7.1-11(a)(7) allows an inspection to be waived where the construction cost is less than $2,500.
Does York County charge for a failed inspection re-check?
Not the first time. Section 7.1-9(f) waives the fee for the first reinspection after a failed inspection, but charges $90 for the third and every subsequent reinspection caused by continued failure.

Sources & Official References

Other rules in York County

All York County rules

Compare York County to another location·View the Virginia building safety overview

Get notified when Building Inspections in York County, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.