Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

First failed inspection
No re-inspection fee under Section 109.8
Re-inspection request
Written application on a city-approved form plus fee
Unpaid fees
Additional inspections are not performed until paid
Permit lapse
180 days suspended between required inspections
Grading
Permittee notifies city official when ready for inspection
Appeals
City Council acts as the board of appeals

Summary

In the City of Yucaipa, California, a re-inspection fee can be imposed when work called for inspection is not complete, required corrections are not made, plans or the inspection record card are missing from the site, or access is not provided. The first rejection for a code failure carries no re-inspection fee. Yucaipa Municipal Code § 15.04.015 adds this as Section 109.8 and stops further inspections until assessed fees are paid.

109.8 Re-inspection Fees. A re-inspection fee may be imposed for each inspection or reinspection, when such portion of work for which inspection is called is not complete or when required corrections are not made. This section is not to be interpreted as requiring re-inspection fees the first time a job is rejected for failure to comply with the requirements of the technical codes, but as a method of controlling the practice of calling inspections before the job is ready for such inspection or reinspection. ... Reinspection fees may be imposed when the inspection record card is not posted, or otherwise not available on the work site; the approved plans are not readily available to the inspector; for failure to provide access on the date for which the inspection is requested; or for deviating from plans requiring the approval of the Building Official. ... To obtain a re-inspection, the applicant must file an application in writing upon a city-approved form and pay the applicable re-inspection fee. ... In instances where re-inspection fees have been assessed, additional inspections of the work will not be performed until the required fees have been paid.

Full Breakdown

Yucaipa's building inspection rule is Section 109.8 of the California Building Code as added by § 15.04.015. A re-inspection fee can be imposed for each inspection or reinspection when the portion of work for which inspection is called is not complete or required corrections are not made. The section is not meant to charge the first time a job is rejected for failure to comply with the technical codes; it controls the practice of calling inspections before the job is ready. Fees can also be imposed when the inspection record card is not posted or is unavailable on the work site, the approved plans are not readily available to the inspector, access is not provided on the date the inspection is requested, or the work deviates from plans needing the Building Official's approval. To get a re-inspection the applicant files a written application on a city-approved form and pays the fee, and no additional inspections happen until assessed fees are paid. The section prints no dollar amount.

Other inspection-linked rules in the same section: a permit becomes invalid if work is suspended or abandoned for 180 days between each required inspection, with one written 180-day extension available, and under Section 111.3 the Building Official can issue a temporary certificate of occupancy before all work is complete if the applicant provides a bond or cash deposit for the cost of completion.

Grading has its own sequence in Chapter 15.12. All permitted grading is subject to inspection by the city official (§ 15.12.370). The permittee must notify the city official when operations are ready for inspection, rough grading must be finished before building permits issue for a graded site, and covered or concealed work can be ordered exposed at no cost to the city (§ 15.12.410). The permittee also notifies the city official when grading is ready for final inspection, and drainage and erosion control must be complete before final approval, except in extreme hardship with an adequate bond (§ 15.12.440).

In local flood hazard areas, the Building Official or City Engineer conducts a Pre-Construction Flood Hazard Inspection before any development permit is approved (Development Code § 83.0301120).

Violations & Fines

Missing inspections or ignoring corrections costs re-inspection fees, and further inspections stop until they are paid. A building permit, building permit inspections or a certificate of use and occupancy can be withheld on property with a grading violation (§ 15.12.450). Grading violations are misdemeanors punishable by a fine of not more than $500, imprisonment of not more than six months, or both, and each day is a separate offense. Other code violations follow § 1.12.040: up to $1,000 and six months as a misdemeanor.

Frequently Asked Questions

Does Yucaipa charge for a failed building inspection?
Not the first time. Section 109.8 says it is not meant to require re-inspection fees the first time a job is rejected for failure to comply with the technical codes. Fees can follow when the work is not complete when inspection is called, corrections are not made, plans or the inspection card are missing, or access is not provided.
How do I get a re-inspection in the City of Yucaipa?
File a written application on a city-approved form and pay the applicable re-inspection fee. Where fees have been assessed, additional inspections of the work are not performed until the required fees have been paid. The code section does not print the dollar amount.
Can an inspection delay cancel my permit?
A permit becomes invalid if work is suspended or abandoned for a period of 180 days between each required inspection. The Building Official can grant only one written extension of 180 days, on a written request that shows justifiable cause. The City Council hears appeals as the board of appeals.
What inspections apply to grading in Yucaipa?
All grading operations needing a permit are subject to inspection by the city official. The permittee notifies the city official when work is ready for inspection and again for final inspection. Concealed work can be ordered exposed, and the owner bears that cost, not the city.

Sources & Official References

Other rules in Yucaipa

All Yucaipa rules

California rules heatmap·Compare Yucaipa to another location·View the California building safety overview

Get notified when Building Inspections in Yucaipa, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Nearby Cities

How other cities in San Bernardino County handle building inspections.

Chino, CA
Some Restrictions
Ontario, CA
Significant Restrictions
Victorville, CA
Some Restrictions