Skip to main content
CityRuleLookup

Brockton, MA Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Single-family permit
$75 plus $10 per fixture
Commercial permit
$150 plus $20 per fixture
Residential re-inspection fee
$31
Illegal work penalty
Fee doubled

Summary

Brockton charges $75 for a single-family plumbing permit plus $10 per fixture, requires the permit be filed before work starts, and doubles the fee for anyone who begins plumbing work without one.

Plumbing Permit (single family) $75.00 Plus, per fixture 10.00 ... Illegal plumbing penalty fee: A permit shall be filed before work begins. Failure to do so shall cause fee to be doubled.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 28).

Full Breakdown

City Code § 4-7 sets the plumbing fee schedule administered by the department of inspectional services. Residential work costs $75 for a single-family plumbing permit plus $10 per fixture, and $75 per apartment plus $10 per fixture for multiple-dwelling plumbing permits. A re-inspection required because of incomplete or defective work costs $31 residentially. Commercial plumbing permits cost $150 plus $20 per fixture, with a $41 re-inspection fee for incomplete or defective commercial work. Subsection (c) states the underlying rule plainly: a permit must be filed before plumbing work begins, and failing to do so causes the fee to be doubled as an illegal-work penalty.

This filing-first requirement functions as Brockton's local plumbing permit mandate, layered on top of the state plumbing code and licensing requirements administered by the Massachusetts Board of State Examiners of Plumbers and Gas Fitters, which govern who may perform the work. The gas fitting fee schedule in the immediately preceding § 4-6 mirrors this structure for gas permits and hot water installations, and both sections were codified at the editor's discretion from ordinances that did not specifically amend the code by their own terms, per the editor's notes following each section.

Violations & Fines

Doing plumbing work before filing the required permit doubles the applicable fee under § 4-7(c). Incomplete or defective work that requires a re-inspection triggers the $31 residential or $41 commercial re-inspection charge in addition to the base permit fee.

Frequently Asked Questions

Does Brockton require a permit before starting plumbing work?
Yes. City Code § 4-7(c) states a permit shall be filed before work begins, and failure to do so causes the fee to be doubled. This applies to both residential and commercial plumbing jobs billed under the § 4-7 fee schedule.
How much does a Brockton plumbing permit cost for a single-family home?
Under § 4-7(a), a single-family plumbing permit costs $75 plus $10 for each fixture installed. Multiple-dwelling permits cost the same $75 base per apartment, also plus $10 per fixture.
What happens if a Brockton plumbing inspection finds defective work?
Section 4-7(a) charges a $31 re-inspection fee for residential jobs with incomplete or defective work, and § 4-7(b) sets a $41 re-inspection fee for commercial jobs, on top of the original permit fee already paid.

Sources & Official References

Other rules in Brockton

All Brockton rules

Compare Brockton to another location·View the Massachusetts building safety overview

Get notified when Plumbing Permits in Brockton, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.