Richland County, SC Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted plumbing code
- 2021 SC Plumbing Code (2021 IPC + SC mods)
- Sewer tap permit
- required, county permitting dept.
- Roughing-in check
- plumbing roughed in before finish
- Max penalty
- $500 fine / 30 days jail
- Governs
- unincorporated Richland County
Summary
Richland County requires plumbing work outside the residential code to follow the 2021 South Carolina Plumbing Code, and a separate county permit before any sewer tap or plumbing connection to a county sewer system.
In addition to the provisions of the plumbing code adopted by this article, a permit must be obtained from the appropriate county permitting department before making any sewer tap or plumbing connection to any sewer system in the county.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-24: This supplement is current through Ordinance No. 033-25HR).
Full Breakdown
Article VIII of Chapter 6 covers plumbing. Section 6-153 states the article regulates installation, alteration, and maintenance of plumbing and related appurtenances not already covered by the 2021 South Carolina Residential Code. Section 6-154 adopts the operative code: the 2021 South Carolina Plumbing Code, including Chapter 1 (Administration) and all amendments, as published by the International Code Council. The county code notes the South Carolina Plumbing Code is the published version of the 2021 International Plumbing Code with state modifications, and that all plumbing workmanship, construction, maintenance, and repair must conform to it.
Section 6-155 adds a county-specific requirement on top of the adopted code: before making any sewer tap or plumbing connection to any sewer system in the county, the installer must obtain a permit from the appropriate county permitting department. That permit obligation is separate from, and in addition to, the general Chapter 6 building permit requirement in Section 6-43 that applies to plumbing installations generally. Under Section 6-54's roughing-in inspection, plumbing must be roughed in, tested, and approved before interior wall or ceiling finish is installed, and under the foundation inspection for slab construction, plumbing must be roughed in under the slab and inspected before concrete is poured. A final inspection under Section 6-56 confirms compliance with the plumbing code before the county issues a certificate of occupancy.
Violations & Fines
Making a sewer tap or plumbing connection without the required county permit under Section 6-155, or performing plumbing work that does not conform to the adopted South Carolina Plumbing Code, is a Chapter 6 violation; Section 6-223 sets the penalty at up to $500 or 30 days in jail, with each day of continued violation counted separately.
Frequently Asked Questions
What plumbing code does Richland County follow?
Do I need a permit to connect to the county sewer system?
When is plumbing inspected during construction in Richland County?
Sources & Official References
Other rules in Richland County
Compare Richland County to another location·View the South Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.