Carroll County, GA Building Safety: Plumbing Permits (2026)
Key Facts
- Code adopted
- International Plumbing Code, § 18-26(5)
- Exempt
- stopping a leak without replacing pipe
- Exempt
- clearing stoppages without moving fixtures
- Not exempt
- replacing a defective concealed pipe
- Inspections
- underground, rough-in, final stages
Summary
Plumbing work in unincorporated Carroll County, Georgia is regulated under the International Plumbing Code, adopted by Code § 18-26(5), and requires a permit under § 18-15 except for narrow repair exemptions listed in § 18-15(b)(5).
(5)Plumbing:a.The stopping of leaks in drains, water, soil, waste or vent pipe; provided, however, that if any concealed trap, drainpipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in this code.b.The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures. ... (5)International Plumbing Code.
Full Breakdown
Section 18-26 adopts the International Plumbing Code as one of the technical construction codes the county enforces, subject to later-edition amendments required by the Georgia Uniform Codes Act. That adoption is enforced through the general permit rule in § 18-15(a): installing, altering, repairing, removing or replacing a plumbing system regulated by the construction codes requires an application to the building official and an issued permit before work begins. Section 18-15(b)(5) narrows that for two specific repairs: stopping leaks in drains, water, soil, waste or vent pipe is exempt, unless a concealed trap, drainpipe, or vent pipe is defective and must be removed and replaced with new material, in which case the code treats it as new work requiring a permit and inspection; and clearing stoppages, repairing leaks in pipes, valves or fixtures, or removing and reinstalling water closets is exempt only if the repair does not involve replacing or rearranging valves, pipes or fixtures.
Anything beyond those narrow repairs, including new plumbing installations and system replacements, needs a permit application through the building official in the community development department, followed by underground, rough-in and final inspections under § 18-16(a)(6)c before work can be covered or the building occupied. Fees set by the board of commissioners must be paid before a permit issues, and starting non-exempt plumbing work before the permit is obtained adds a penalty equal to 100 percent of the usual fee (§ 18-15(i)(1)-(2)). This applies only to unincorporated Carroll County; Carrollton, Villa Rica, Temple, Bowdon, Whitesburg, Mount Zion and Roopville each administer their own plumbing permits.
Violations & Fines
Plumbing work requiring a permit performed without one is a misdemeanor under § 18-18, with each day of continued violation a separate offense punished as state law provides. The building official can also disconnect utility service where noncompliant plumbing creates an immediate hazard under § 18-16(b)(4)c.
Frequently Asked Questions
What plumbing code applies in unincorporated Carroll County?
Can I fix a leaking pipe myself without a permit?
Do I need a permit to reinstall a toilet?
Sources & Official References
Other rules in Carroll County
Compare Carroll County to another location·View the Georgia building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.