Skip to main content
CityRuleLookup

Chattanooga, TN Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2018 International Plumbing Code, locally amended
Permit trigger
Any regulated plumbing construction, alteration or repair
Base permit fee
$40.00 plus itemized fixture charges
Permit lapses
180 days unstarted or 180 days suspended
Extension
One extension, up to 180 days, for good cause
Appeals body
Construction Board of Adjustment and Appeals

Summary

Chattanooga adopts the 2018 International Plumbing Code with local amendments under City Code Sec. 27-1 and Sec. 27-3. A licensed contractor must obtain a permit before plumbing work begins, permits lapse after 180 days of inactivity, and the code sets a full line-item fee schedule.

Section 106.1 and all its subsections are deleted in their entirety and the following language is substituted in lieu thereof: 106.1 Where required. Any properly licensed contractor who desires to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any plumbing system, the installation of which is regulated by this code, or to cause any such work to be performed, shall first make application to the code official and obtain the required permit for the work.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 40 Update 1).

Full Breakdown

Chattanooga City Code Sec. 27-1 adopts the 2018 edition of the International Plumbing Code, as locally amended, as the city's official Plumbing Code, with a copy on file in the Office of the City Council Clerk. Sec. 27-3 rewrites several sections of that model code for local practice. Amended Section 106.1 requires that any properly licensed contractor who wants to construct, enlarge, alter, repair, move, demolish or change the occupancy of a structure, or to install, alter, repair, remove, convert or replace a regulated plumbing system, first apply to the code official and obtain the required permit before the work is performed. Amended Section 106.5.3 voids a permit if authorized work has not started within 180 days of issuance, or if work is suspended or abandoned for 180 days after starting; a new permit is required before work can resume. Section 106.5.4 lets a permittee apply for one extension of up to 180 days for good and satisfactory reasons; no permit may be extended more than once.

The amended fee schedule in Section 106.6.2 charges $40.00 to issue each permit, plus itemized charges: $6.00 per plumbing fixture, floor drain or trap; $5.00 per roof drain; $20.00 per building sewer, and $20.00 for a replaced or repaired building sewer; $6.00 per water heater and/or vent; $10.00 for water piping or treating equipment work; $10.00 for drainage or vent piping repair; $6.00 per pressure-reducing device or check valve assembly (one to five); $10.00 per vacuum breaker or backflow device; $35.00 per underground and $10.00 per above-ground grease, sand or oil interceptor; $70.00 per sanitary sewer connection; $800.00 per lateral sewer connection; $100.00 per manhole; and $50.00 per re-inspection. Fees are non-refundable unless the Director of Public Works determines review was incomplete due to inaccurate lateral-sewer location information, in which case a proportional refund is at the Director's sole discretion. Appeals from the Building Official's decisions and requests for variances go to the Construction Board of Adjustment and Appeals under amended Section 109.1, established at City Code Part II, Sec. 2-625.

Violations & Fines

Doing regulated plumbing work covered by Section 106.1 without first obtaining a permit is a code violation subject to the citywide general penalty, Sec. 1-8: a fine up to $500.00, with each day of continued unpermitted work a separate offense. Letting a permit lapse (180 days unstarted or 180 days suspended) requires a new permit before work can resume, and re-inspections are billed at $50.00 each under the Sec. 27-3 fee schedule.

Frequently Asked Questions

What plumbing code does Chattanooga use?
Chattanooga adopts the 2018 International Plumbing Code as its official Plumbing Code under Sec. 27-1, with local amendments spelled out in Sec. 27-3 covering permitting, fees, and several technical sections like sewer depth and vent terminations.
Who needs a plumbing permit in Chattanooga?
Under the locally amended Section 106.1, any properly licensed contractor doing regulated plumbing work, including installing, altering, repairing, removing, converting or replacing a plumbing system, must apply to the code official and obtain a permit before starting the work.
How much does a Chattanooga plumbing permit cost?
The base issuing fee is $40.00, plus itemized charges such as $6.00 per fixture, $20.00 per building sewer, $800.00 per lateral sewer connection, and $50.00 per re-inspection, all set out in the Section 106.6.2 fee schedule under Sec. 27-3.
How long is a Chattanooga plumbing permit valid?
Under amended Section 106.5.3, a permit expires if the authorized work hasn't started within 180 days of issuance, or if it's suspended or abandoned for 180 days after starting. One 180-day extension is available for good cause under Section 106.5.4, but no permit can be extended more than once.

Sources & Official References

Other rules in Chattanooga

All Chattanooga rules

Compare Chattanooga to another location·View the Tennessee building safety overview

Get notified when Plumbing Permits in Chattanooga, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.