Glendale, CA Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Trigger
backflow assembly required for new building or meter
Permit issued by
city permit services section
Notice period to comply
30 calendar days
Civil penalty
$250 per backflow device
Appeal body
Glendale Water & Power Commission
Appeal deadline
15 calendar days
Testing frequency
at least annually, certified tester

Summary

When a new building or facility in Glendale needs a backflow prevention assembly to protect the water system, the city's permit services section must issue a plumbing permit to comply with the city plumbing code. Water and Power reviews plans; noncompliance can mean water service termination and a $250-per-device civil penalty.

New Buildings and Facilities. The city building section and permit services section, in cooperation with the water service section of the Glendale water and power department, will review plans and other conditions to determine if a backflow assembly is required or waived as water service protection for new buildings and facilities. If the installation of a backflow prevention assembly is required in the building or as a meter protection, a plumbing permit shall be issued by the permit services section to comply with the city plumbing code. Existing commercial and industrial buildings and facilities will be reviewed for compliance with city backflow prevention ordinance when changes in occupancy occur or when required by the assistant general manager.

Full Breakdown

050(B) requires the city building section and permit services section, working with the Glendale Water and Power Department's water service section, to review plans for new buildings and facilities to decide whether a backflow prevention assembly is required or can be waived as water service protection. If a backflow assembly is required in the building or as meter protection, the permit services section must issue a plumbing permit to comply with the city plumbing code before the work proceeds. Existing commercial and industrial buildings are re-reviewed for backflow compliance whenever occupancy changes or the assistant general manager requires it.

100 until the device is installed, repaired or tested with passing results. 120 backs this with a civil penalty of $250 per assembly for noncompliance with the 30-day notice, on top of the actual costs of installation, testing, repair or replacement and city staff time. 140(E) within 15 calendar days of the notice of assessed charges, and the commission's decision on appeal is final. 070(C).

Violations & Fines

Missing the 30-day corrective notice under Section 13.32.090 triggers a $250 civil penalty per backflow assembly under Section 13.32.120, plus the department's actual costs of installing, testing, repairing or replacing the device and any related city personnel time. Continued noncompliance results in water service termination under Section 13.32.100 until the device passes inspection and all fees are paid. Appeals of the civil penalty go to the Glendale Water and Power Commission within 15 calendar days.

Frequently Asked Questions

When does Glendale require a plumbing permit for a backflow device?
Under Section 13.32.050(B), a plumbing permit is required whenever plan review for a new building or facility shows a backflow prevention assembly is needed to protect the water system, either at the building or as meter protection. The permit services section issues it to comply with the city plumbing code.
What happens if I miss the deadline to install my backflow device?
The assistant general manager gives 30 days' written notice to complete corrective action under Section 13.32.090. Missing that window lets the department terminate water service under Section 13.32.100 and assess a $250 civil penalty per device under Section 13.32.120, plus the city's actual costs.
Can I appeal a backflow prevention penalty in Glendale?
Yes. Section 13.32.120(D) lets any user assessed civil penalties or costs appeal to the Glendale Water and Power Commission under Section 2.72.140(E) within 15 calendar days of the notice of assessed charges. The commission's decision on that appeal is final.

Sources & Official References

Other rules in Glendale

All Glendale rules

California rules heatmap·Compare Glendale to another location·View the California building safety overview

Get notified when Plumbing Permits in Glendale, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in Los Angeles County handle plumbing permits.

Downey, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Long Beach, CA
Some Restrictions
Carson, CA
Some Restrictions
Compton, CA
Some Restrictions
Los Angeles, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions