Issaquah, WA Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- 2021 Uniform Plumbing Code (IAPMO), Chapter 51-56 WAC
- Excluded UPC chapters
- Chapter 1, Chapter 12 Fuel Gas Piping, Chapter 14 Firestop
- Permit authority
- Building Official, IMC 16.04.010 Section 105.1
- Stand-alone plumbing permit term
- Expires 1 year from issuance
- Grease regulation
- Chapter 16.38 IMC, Fats, Oils and Grease
- Notice of violation penalty
- $250.00 per day after the compliance date
Summary
Issaquah adopts the 2021 Uniform Plumbing Code, published by the International Association of Plumbing and Mechanical Officials, for plumbing work in the city. The UPC's own Chapter 1 administration is excluded, so permits run through the Construction Administrative Code and the Building Official. Violations are civil violations enforced under Chapter 8.45 IMC.
The 2021 Edition of the Uniform Plumbing Code, as published by the International Association of Plumbing and Mechanical Officials and adopted by the State Building Code Council in Chapter 51-56 WAC, excluding Chapter 1, “Administration;” Chapter 12, “Fuel Gas Piping;” Chapter 14, “Firestop Protection;” is adopted, together with Appendix Chapter A, “Recommended Rules for Sizing the Water Supply System;” Appendix Chapter B, “Explanatory Notes on Combination Waste and Vent Systems;” Appendix Chapter I, “Installation Standard for PEX Tubing Systems for Hot- and Cold-Water Distribution;” and Appendix Chapter M, “Peak Water Demand Calculator.” ... Provided, that those requirements of the Uniform Plumbing Code relating to venting and combustion air of fuel fired appliances as found in UPC Chapter 5 and those portions of the UPC addressing building sewers are not adopted. ... Provided further, that the regulation of fats, oils, and grease shall be in accordance with Chapter 16.38 IMC, Fats, Oils and Grease Regulations.
Full Breakdown
IMC 16.04.080 adopts the 2021 Edition of the Uniform Plumbing Code as adopted by the State Building Code Council in Chapter 51-56 WAC. Issaquah excludes Chapter 1, "Administration," Chapter 12, "Fuel Gas Piping," and Chapter 14, "Firestop Protection." It adds four appendix chapters: A on sizing the water supply system, B on combination waste and vent systems, I on PEX tubing for hot- and cold-water distribution, and M, the Peak Water Demand Calculator. Two further carve-outs matter to contractors. The UPC requirements on venting and combustion air of fuel fired appliances in UPC Chapter 5 are not adopted, and neither are the UPC portions addressing building sewers. Fats, oils, and grease are regulated under Chapter 16.38 IMC instead. Where Appendix I conflicts with the manufacturer's installation instructions, the conditions of the listing and the manufacturer's instructions apply.
The permit process comes from the Construction Administrative Code adopted at IMC 16.04.010. Section 105.1 requires an owner or authorized agent who intends to erect, install, enlarge, alter, repair, remove, convert or replace any gas, mechanical or plumbing system to apply to the Building Official and obtain the required permit first. Section 105.1.1 lets the Building Official issue an annual permit, instead of a permit for each alteration to an already approved plumbing installation, to a person, firm or corporation regularly employing one or more qualified trade persons on premises it owns or operates. The holder must keep a detailed record of the alterations. The exempt-work list covers stopping or repairing leaks in drains, water, soil, waste or vent pipes and clearing stoppages, but if a trap or pipe is defective and must be removed and replaced with new material, that is new work requiring a permit and inspection. Under Section 107.2.10, plans must be submitted whenever the scope of plumbing work is too complex for inspection alone, as the Building Official determines.
A plumbing permit expires at the same time as the associated building permit. If no building permit is issued, it expires 1 year from the date of issuance.
Violations & Fines
Under IMC 16.04.130, a violation of the construction codes chapter is a civil violation enforced under Chapter 8.45 IMC. A notice of violation and order carries a cumulative penalty of $250.00 per day from the compliance date, and repeat violations within 2 years can draw up to $500.00 per day. IMC 8.45.020 also makes it unlawful to maintain a use of a structure or land without the permits the code requires, and unlawful to misrepresent a material fact in a construction application.
Frequently Asked Questions
Does Issaquah require a permit for plumbing work?
Which plumbing code does Issaquah use?
Is a leak repair exempt from a permit in Issaquah?
How long does an Issaquah plumbing permit last?
Sources & Official References
Other rules in Issaquah
Compare Issaquah to another location·View the Washington building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Plumbing Permits in Nearby Cities
How other cities in King County handle plumbing permits.