Issaquah, WA Building Safety: Green Building Code (2026)
Key Facts
- Governing section
- IMC 16.40.060, Diversion of materials from landfills
- Required bins
- Two C&D bins on site at all times, recycling and landfill
- Large project diversion
- Minimum of 50 percent of C&D materials recycled
- Small demolition threshold
- Buildings or portions under 2,500 square feet
- Shower flow limit
- 2.0 gpm combined, dwelling unit shower compartments
- Reporting
- Plan before permit issuance, report before finalization
Summary
Issaquah's sustainable building chapter, IMC 16.40, sets mandatory construction practices rather than an optional rating program. Section 16.40.060 requires two on-site bins, one for recycling and one for landfill-bound waste, on every project, and large projects must divert a minimum of 50 percent of construction and demolition materials to recycling.
A. Purpose. The purpose of this section is to increase the reuse and recycling of construction and building removal materials. ... C. Small Project Requirements. 1. Small projects include: a. New single-family home building permits (additions and remodels less than 1,000 square feet are exempt); b. Demolition permits for buildings or portions of buildings less than 2,500 square feet; and c. Tenant improvement permits less than 5,000 square feet. 2. Small projects shall have, at a minimum, two construction and demolition (C&D) bins on site at all times. One bin shall be for commingled recyclable materials and one bin shall be for landfill-bound waste. ... b. Large projects shall divert to recycling a minimum of 50 percent of construction and demolition materials removed from the site.
Full Breakdown
Chapter 16.40 of the Issaquah Municipal Code states in 16.40.010 that its intent is to regulate construction practices to reflect a broader community vision of conserving energy, water and other natural resources, reducing greenhouse gas emissions, recycling construction materials, reducing solid waste and improving indoor air quality. The chapter provides mandatory requirements. Its definitions and scope sections (16.40.020 and 16.40.030) are reserved, and the heat island mitigation section (16.40.040) was repealed by Ord. 2936, so the operative rules are 16.40.050 and 16.40.060.
Section 16.40.060 covers diversion of materials from landfills, with the stated purpose of increasing reuse and recycling of construction and building removal materials. Emergency work or disaster response, and removal of buildings or structures the Building Official determines are hazardous or dangerous, are exempt. Small projects are new single-family home building permits (additions and remodels under 1,000 square feet are exempt), demolition permits for buildings or portions of buildings under 2,500 square feet, and tenant improvement permits under 5,000 square feet. A small project must keep at least two construction and demolition (C&D) bins on site at all times: one for commingled recyclables, sent to a third party certified C&D recycling facility, and one for landfill-bound waste.
Large projects are all projects not defined as small. They also keep two C&D bins on site at all times, or more bins for source separated recycling, and must divert to recycling a minimum of 50 percent of construction and demolition materials removed from the site. A waste diversion plan is due before permit issuance, stating the approximate weight of material to be removed, the hauler and the receiving facility for each commodity. Demolition permits add a completed building removal hierarchy checklist, any pertinent Asbestos Hazard Emergency Response Act inspection documentation and Puget Sound Clean Air Agency permit numbers as necessary. A waste diversion report with tipping floor receipts is due before permit finalization or a certificate of occupancy.
Section 16.40.050 amends the Uniform Plumbing Code: shower outlets operating simultaneously cannot exceed 2.0 gpm in dwelling unit and guestroom shower compartments, and lavatory faucets must be self-closing, with hand operated metering faucets staying open 10 seconds minimum.
Violations & Fines
Chapter 16.40 does not print a penalty schedule of its own. Enforcement runs through the permit: the waste diversion plan must be provided prior to permit issuance for large projects, and the waste diversion report must be provided prior to permit finalization or issuance of a certificate of occupancy. A project that cannot document its diversion hauler, receiving facility and tonnage stalls at those two checkpoints.
Frequently Asked Questions
Which Issaquah projects count as small under the recycling rule?
What paperwork does a large project owe the City?
Are there exemptions from the diversion requirements?
Does Issaquah regulate water-saving fixtures in new construction?
Sources & Official References
Other rules in Issaquah
Compare Issaquah to another location·View the Washington building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Green Building Code in Nearby Cities
How other cities in King County handle green building code.