Summary

In the City of Royal Oak, any new or altered water service connection to the municipal water main requires a permit from the City Clerk before work begins. Only a plumber licensed as a master plumber in the City of Royal Oak may pull that permit. The City Commission sets the connection fees, which cover tapping the main and installing the curb stop, and those fees must be paid before the permit issues.

§ 752-2. Permit required for service connections. Before any service connection shall be made or any work performed upon old or new connections, a permit shall be obtained from the City Clerk. No permit shall be issued to any person who is not licensed as a master plumber in the City of Royal Oak. § 752-3. Fees. ... The City Commission shall, from time to time, establish fees to be charged for services rendered by the officers, agents and employees of the City incident to the granting of the permit herein provided for, which fees shall be paid before the permit is issued.

Full Breakdown

Chapter 752, Waterworks, requires a permit before any service connection is made or any work is performed on old or new connections to the Royal Oak water system. The City Clerk issues the permit, and § 752-2 bars issuance to anyone who is not licensed as a master plumber in the City of Royal Oak. Once issued, § 752-5 places the work under the supervision of the City's proper officers, and service pipes must be laid according to the City's waterworks rules and regulations. The City Commission sets connection fees under § 752-3, covering the cost of tapping the main, installing the curb stop and laying the pipe to the curb stop; the curb stop and pipe remain City property, and fees must be paid before the permit is issued.

Where a connection is meant to serve more than one tenement, shop, store or building, § 752-6 requires a separate branch and stop cock for each unit served, and no single service may supply more than one lot unless it holds a single building used for a single industry or enterprise. The City's water permitting rule survives even though the standalone City of Royal Oak Plumbing Code, Ordinance No. 75-7, was repealed on January 24, 2005; plumbing work inside a structure is now handled through the state construction code process administered by the City's Building Official, while work tapping into or altering the municipal water main still runs through this Chapter 752 permit and master-plumber requirement.

Meters for measuring usage are installed by the City on all served premises under § 752-7, and tampering with a meter or interfering with a City meter reading is itself unlawful.

Violations & Fines

Connecting to or altering the municipal water system without a City Clerk permit, or using anyone but a master plumber licensed in Royal Oak, violates § 752-2. Under § 752-8, the City may disconnect the premises from the water distribution system and withhold water supply whenever its waterworks ordinances, rules or regulations have been violated by the owner or occupant, and the Water Department will not restore service until the violation is corrected.

Frequently Asked Questions

Do I need a permit to connect to the water main in Royal Oak?
Yes. Section 752-2 of the City Code requires a permit from the City Clerk before any new or altered service connection is made to the Royal Oak water system, and the permit cannot be issued to anyone who is not a licensed master plumber in the City.
Who sets the fee for a Royal Oak water connection permit?
The City Commission sets connection fees under § 752-3. They cover the City's cost of tapping the water main, installing the curb stop and laying pipe to the curb stop, and must be paid in full before the City Clerk issues the permit.
Is there still a separate City of Royal Oak Plumbing Code?
No. The standalone City of Royal Oak Plumbing Code, Ordinance No. 75-7, was repealed on January 24, 2005, according to the editor's note at § 745-72. Interior plumbing work now runs through the state construction code process, while water main connections remain governed by Chapter 752.
What happens if I violate Royal Oak's water connection rules?
Under § 752-8, the City may disconnect the premises from the water distribution system and withhold supply until the violation of the applicable waterworks ordinances, rules or regulations is corrected, at the owner's or occupant's expense.

Sources & Official References

Other rules in Royal Oak

All Royal Oak rules

Compare Royal Oak to another location·View the Michigan building safety overview

Get notified when Plumbing Permits in Royal Oak, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.