Santee, CA Building Safety: Plumbing Permits (2026)
Key Facts
- Governing chapter
- Santee Municipal Code Chapter 11.12
- Adopted code
- 2025 CA Plumbing Code, UPC 2024 base
- Solar pre-plumbing
- Required in new residential buildings
- Pool heater solar collector
- 50% of pool surface area minimum
- Appendices adopted
- A, B, D, G and I
- Appeal deadline
- 10 days to City Council
Summary
Santee amended and adopted the 2025 California Plumbing Code, Part 5 of Title 24, under Municipal Code Chapter 11.12, governing permits for all plumbing, gas and drainage work in the city. New residential construction must pre-plumb for a future solar water heater, and any new fossil-fuel pool heater needs a matching solar collector before the Building Official issues a permit.
§ 11.12.010. Adoption of the 2025 California Plumbing Code, Part 5, Title 24 of the California Code of Regulations. There is adopted and incorporated by reference herein as the City Plumbing Code for the purpose of prescribing regulations in the City of Santee for the construction, alteration, moving, demolition, repair and use of all plumbing, gas or drainage piping and systems or water heating or treating equipment in or on any building or structure or outdoors on any premises or property, the 2025 California Plumbing Code, Part 5, Title 24 of the California Code of Regulations, a portion of the California Building Standards Code, as defined in the California Health and Safety Code, Section 18901 et seq. based on the Uniform Plumbing Code 2024 Edition. Except as otherwise provided by this Chapter and Chapter 11.02 of the City of Santee Municipal Code, all construction, alteration, moving, demolition, repair and use of all plumbing, gas or drainage piping and systems or water heating or treating equipment within the City of Santee shall be in conformance with 2025 California Plumbing Code, published by the California Building Standards Commission.
Full Breakdown
Chapter 11.12 of the Santee Municipal Code adopts the 2025 California Plumbing Code, Part 5, Title 24 of the California Code of Regulations, based on the Uniform Plumbing Code 2024 Edition, for the construction, alteration, moving, demolition, repair and use of all plumbing, gas or drainage piping and water heating or treating equipment in the City of Santee. Section 11.12.020 adds two local requirements on top of the state text. Section 104.1.1 requires every new residential building to include pre-plumbing and adequate space for a solar storage tank capable of heating domestic potable water; the Building Official may not issue a permit for a new residential building that omits this pre-plumbing, though the administrative authority can exempt a lot that lacks feasible solar access because of shading, orientation or lot configuration.
Section 104.1.2 requires that any new or replacement fossil-fuel swimming pool heater be backed by a solar collector covering at least half of the pool's surface area as the pool's primary heat source; a separate spa may still use fossil fuel. A pool owner who believes the solar mandate should not apply because of shading, tree cover or an enclosed structure can ask the administrative authority for a waiver, and an applicant unhappy with that decision can appeal in writing to the City Clerk within ten days, with the City Council's ruling on appeal being final. Section 11.12.030 separately adopts Appendices A, B, D, G and I of the 2025 California Plumbing Code.
Violations & Fines
Santee will not issue a plumbing permit for a covered new home without the required solar pre-plumbing, and will not issue a permit for a new or replacement gas, propane, diesel or electric pool heater unless the accompanying solar collector meets the fifty-percent coverage rule; both denials happen at the plan-review stage before work can start. A ten-day appeal window to the City Council runs from the date of any written denial or waiver decision.
Frequently Asked Questions
Does Santee require a permit for plumbing work?
Do new homes in Santee need solar pre-plumbing?
Can I install a gas pool heater in Santee?
How do I appeal a denied solar waiver?
Sources & Official References
Other rules in Santee
California rules heatmap·Compare Santee to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Plumbing Permits in Nearby Cities
How other cities in San Diego County handle plumbing permits.