Cherry Hill, NJ Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

RA residential building coverage
25% max
RA residential lot coverage
30% max
RA nonresidential lot coverage
65% max
Nonresidential open space (RA)
25% minimum
Definition
any impervious surface, § 40-202
Enforcement
Zoning Officer

Summary

Cherry Hill Township defines lot coverage as any impervious surface covering a lot, and every zoning district caps it directly in its own bulk table. In the Residential Agriculture (RA) zone, the township's largest-lot residential district, maximum building coverage is 25% and total lot coverage is capped at 30% on both inside and corner lots.

D. Bulk requirements. ... Except as otherwise modified, the following bulk standards shall apply to all buildings in the Residential Agriculture (RA) zone: Minimum Requirements Residential Uses Nonresidential Uses Inside Lot Corner Lot Inside Lot Corner Lot ... Maximum building cover (percent) 25% 25% 30% 30% Maximum lot cover (percent) 30% 30% 65% 65% Open space (percent) n/a n/a 25% 25%

Full Breakdown

Cherry Hill Township Code § 40-202 defines LOT COVERAGE as "the area of a lot covered by any impervious surface," a term distinct from BUILDING COVERAGE, which counts only the ground-floor exterior walls of principal and accessory buildings. Each of the eighteen zoning districts created in Chapter 40 sets its own coverage ceiling in the "Bulk requirements" subsection D of its own section, printed as a four-column table covering Residential Inside Lot, Residential Corner Lot, Nonresidential Inside Lot, and Nonresidential Corner Lot. In the Residential Agriculture (RA) zone at § 40-402D, a residential use is capped at a maximum building coverage of 25% on both inside and corner lots, and a maximum lot coverage, meaning all impervious surface including driveways and patios, of 30%, identical for inside and corner lots.

A nonresidential use permitted in the RA zone, such as a church, school, or municipal use, is held to a looser 30% building coverage and 65% lot coverage, but must in exchange set aside at least 25% of the site as usable open space under § 40-401K, a requirement that does not apply to residential lots. A. 40:55D-70c, defined at § 40-202 as a departure from setback, yard, frontage, lot size or similar physical requirements that would otherwise significantly interfere with use of the property.

Other districts, from the Residential (R1, R2, R3) zones through the Business (B1-B4) and Institutional (IN) zones, each carry their own coverage percentages in their own § D bulk tables.

Violations & Fines

Cherry Hill enforces coverage limits through the Zoning Officer at permit review; building without a permit or exceeding the approved footprint is a zoning violation under Chapter 1. Section 1-5.1 sets the township-wide default penalty at up to $2,000 or 90 days, with an editor's note requiring a 30-day cure period before any zoning fine over $1,250 becomes payable.

Frequently Asked Questions

What counts as lot coverage in Cherry Hill Township?
Cherry Hill Township Code § 40-202 defines lot coverage as the area of a lot covered by any impervious surface, which includes driveways, patios, and structures, not just building footprint. It is tracked separately from "building coverage," which counts only the ground floor of buildings.
How much of my lot can I cover in the RA zone?
In the Residential Agriculture (RA) zone, § 40-402D caps residential building coverage at 25% of the lot and total lot coverage, including driveways, patios and any other impervious surface, at 30%. The same percentages apply whether the lot is an interior lot or a corner lot.
Do coverage limits differ for nonresidential uses in the RA zone?
Yes. Section 40-402D allows nonresidential uses, such as a church or school permitted in the RA zone, up to 30% building coverage and 65% lot coverage, but requires at least 25% of the site to remain usable open space under § 40-401K.
What happens if I exceed the lot coverage limit?
Exceeding the printed cap requires a bulk (c) variance from the Zoning Board of Adjustment under N.J.S.A. 40:55D-70c before a building permit can issue; building over the limit without one is a Chapter 1, § 1-5.1 zoning violation punishable by up to $2,000 or 90 days.

Sources & Official References

Other rules in Cherry Hill

All Cherry Hill rules

Compare Cherry Hill to another location·View the New Jersey building setbacks & zoning overview

Get notified when Lot Coverage Limits in Cherry Hill, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.