Key Facts

PRD-1 to PRD-4 coverage
25 percent of gross development
PRD-5 and PRD-6 coverage
30 percent of gross development
PRD-7 and PRD-8 coverage
35 percent of gross development
RD and RD-2 site coverage
50 percent by all structures
PRD common open space
At least 10 percent of total area
R-1 to R-4 maximum building area
None specified

Summary

In the City of Decatur, Alabama, the zoning code caps building coverage at 25 to 35 percent of the gross development in Planned Residential Development districts (Sec. 25-10.1) and at 50 percent in the RD and RD-2 redevelopment districts. The R-1 through R-5 district rows list no maximum building area and rely on yard setbacks.

(I)PRD Districts, and layout and design requirements. PRD Districts together with applicable minimum yard, height, area coverage, and density requirements for each district are hereby established as follows: PRD Districts Maximum Dwelling Units Per Gross Acre Maximum Building Height Stories Feet Maximum Percentage Lot Coverage of Buildings on Gross Development Building Setback Requirements in Feet (at Exterior Boundaries of PRD Site) Front Rear Side PRD-1 2.0 2.5 35 25 40 45 15 PRD-2 2.6 2.5 35 25 40 45 15 PRD-3 3.0 2.5 35 25 35 40 8 PRD-4 3.5 2.5 35 25 35 40 8 PRD-5 4.25 3.0 40 30 30 35 8 PRD-6 5.0 3.0 40 30 30 35 8 PRD-7 12.5 N/A N/A 35 25 30 8 PRD-8 20.0 N/A N/A 35 25 30 8

Full Breakdown

Decatur's zoning chapter caps building coverage only in certain districts, and the clearest numbers sit in the Planned Residential Development (PRD) table in Sec. 25-10.1(I). The table lists a maximum percentage lot coverage of buildings on the gross development: 25 percent in PRD-1 through PRD-4, 30 percent in PRD-5 and PRD-6, and 35 percent in PRD-7 and PRD-8. Density climbs with coverage, from 2.0 dwelling units per gross acre in PRD-1 to 20.0 in PRD-8. A PRD must be a tract of at least five acres, and Sec. 25-10.1(H)(2) requires at least 10 percent of the total area to be usable common open space, which cannot include streets, alleys, vehicular drives, parking and loading areas, or space reserved for one tenant or owner.

Outside the PRD districts the conventional residential districts do not cap coverage by percentage. The R-1, R-2, R-3 and R-4 rows in Sec. 25-10.8 through 25-10.11 read Maximum building area: None specified, the R-5 row says the same, and the R-1E estate district reads "Maximum coverage—None specified." Yard setbacks, not a percentage, decide how much of the lot can be built on.

The redevelopment districts are the other exception. Sec. 25-11.2(c)(5) for the RD district and Sec. 25-11.3(b)(6) for RD-2 both set the maximum building site coverage by all structures at fifty percent, and both districts describe lot coverage as one of the flexible standards they offer property owners. New development in the RD district needs planning commission site plan approval before any related building permit issues (Sec. 25-11.2(c)(12)).

An approved PRD development plan is recorded with the Morgan County probate court and, under Sec. 25-10.1(F), limits and controls the issuance of permits and restricts the use of all land and structures in the district.

Violations & Fines

Sec. 25-26 fines a person who violates the zoning chapter not less than $2 and not more than $100 plus court costs for each offense, and each day the violation continues is a separate offense. Under Sec. 25-24 the building inspector can seek an injunction or other proceeding to abate a structure built in violation of the chapter, and Sec. 25-6 bars the inspector from issuing a permit for plans that do not conform.

Frequently Asked Questions

Is there a lot coverage limit for a house in an R-1 district?
Not as a percentage. The R-1 row in Sec. 25-10.8 reads Maximum building area: None specified. What limits the footprint is the setback package: 40 feet in front, 45 feet in the rear and 15 feet on the sides, on a minimum lot of 14,000 square feet, plus a 35-foot height ceiling.
What coverage does a Planned Residential Development allow?
Sec. 25-10.1(I) sets a maximum percentage lot coverage of buildings on the gross development: 25 percent for PRD-1 through PRD-4, 30 percent for PRD-5 and PRD-6, and 35 percent for PRD-7 and PRD-8. The percentage applies to the whole development, not each lot inside it, and the planning commission reviews the plan.
How much of a lot can be covered in the RD redevelopment districts?
Fifty percent. Sec. 25-11.2(c)(5) says the maximum building site coverage by all structures in the RD district shall be fifty percent, and Sec. 25-11.3(b)(6) repeats the figure for RD-2, which covers the Sixth Avenue SE corridor. Both districts require planning commission site plan approval before new construction permits.
Does the 10 percent open space in a PRD include driveways and parking?
No. Sec. 25-10.1(H)(2) requires at least 10 percent of the total PRD area to be usable common open space and excludes areas reserved for an individual tenant or owner, dedicated streets, alleys and other rights-of-way, and vehicular drives, parking, loading and storage areas. The plan must also guarantee permanent retention and maintenance of that open space.

Sources & Official References

Other rules in Decatur

All Decatur rules

Compare Decatur to another location·View the Alabama building setbacks & zoning overview

Get notified when Lot Coverage Limits in Decatur, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.