Skip to main content
CityRuleLookup

Wausau, WI Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Max impervious surface (SR-2)
45 percent of lot area
Minimum lot area (SR-2)
15,000 square feet
Minimum lot width (SR-2)
100 feet
Governing law
Title 23 Zoning, eff. Jan. 1, 2020
Enforcing agency
Div. of Inspection, Zoning & Electrical Systems
General penalty
$10-$200 forfeiture per offense per day

Summary

Wausau's Title 23 zoning code caps how much of a lot can be covered by buildings and paved surface, expressed as a maximum impervious surface ratio in each district's bulk table. In the SR-2 Single Family Residential-2 district, the city's most common single-family zone, the limit is 45 percent on a minimum 15,000-square-foot lot, enforced by the Division of Inspection, Zoning and Electrical Systems.

23.02.30 - (SR-2) Single Family Residential-2 Zoning District. ... (7)Density, intensity, and bulk regulations for the (SR-2) Single Family Residential-2 District. ... Minimum Lot Area 15,000 square feet Maximum Impervious Surface Ratio 45 percent Minimum Lot Width 100 feet Minimum Lot Depth 110 feet

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 12 Update 2).

Full Breakdown

Wausau's 2019 zoning rewrite, Title 23 of the Municipal Code, effective January 1, 2020, regulates lot coverage through a Maximum Impervious Surface Ratio line printed in the density, intensity and bulk table for each zoning district under Article II. 30(7) sets the ratio at 45 percent of lot area, applied to a minimum lot size of 15,000 square feet, a minimum lot width of 100 feet and a minimum lot depth of 110 feet. Impervious surface includes the building footprint plus driveways, patios, walkways and any other surface that sheds rather than absorbs stormwater, so a homeowner adding a large room, a detached garage and a paved driveway on a standard SR-2 lot must keep the combined coverage under the 45 percent ceiling.

10, confirms that all structures must comply with the requirements listed for each zoning district in Article II, meaning the impervious ratio applies alongside the district's setback, height and lot-area standards rather than in isolation. 51. 02 tables, so the applicable percentage always depends on the parcel's specific zoning district, not a single citywide number.

Violations & Fines

Building or paving beyond the maximum impervious surface ratio is an unlawful land use under Wausau Municipal Code Section 23.10.60(1), which bars any development activity that violates Title 23. The City reserves the right to order abatement and bill the property owner for the cost under Section 23.10.60(3). Because Title 23 sets no separate fine for this violation, the general municipal penalty in Section 1.01.110 applies: a forfeiture of not less than $10.00 nor more than $200.00 per offense, with each day a violation continues charged as a separate offense.

Frequently Asked Questions

What is the maximum lot coverage allowed in Wausau's SR-2 district?
Wausau Municipal Code Section 23.02.30(7) caps impervious surface at 45 percent of lot area in the (SR-2) Single Family Residential-2 district, the city's standard single-family zone with a 15,000-square-foot minimum lot. That 45 percent covers the house, garage, driveway, patio and any other surface that does not absorb stormwater.
Does the 45 percent limit apply to every lot in Wausau?
No. The impervious surface ratio is set district by district in Title 23, Article II. The 45 percent figure applies specifically to the (SR-2) Single Family Residential-2 district; other residential and commercial districts carry their own ratios in their own bulk tables under Section 23.02.
What happens if a property in Wausau exceeds its lot coverage limit?
The City can require abatement and bill the owner for the cost under Section 23.10.60(3), and a general forfeiture of $10.00 to $200.00 applies under Section 1.01.110, with each day the excess coverage continues counted as a separate offense.
Who enforces Wausau's lot coverage rules?
The City of Wausau's Division of Inspection, Zoning and Electrical Systems reviews building permit applications against the Title 23 bulk tables, including the maximum impervious surface ratio, before construction can proceed on a lot in the SR-2 district or any other zoning district.

Sources & Official References

Other rules in Wausau

All Wausau rules

Compare Wausau to another location·View the Wisconsin building setbacks & zoning overview

Get notified when Lot Coverage Limits in Wausau, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.