Skip to main content

Bartow County, GA Building Setbacks & Zoning: Setback Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

A-1 / RE-1 / RE-2 setbacks
40 ft front, 10 ft side, 25 ft rear
R-1 residential setbacks
25 ft front, 10 ft side, 25 ft rear
C-1 and I-1 setbacks
40 ft front, 20 ft side, 20 ft rear
M-1 Mining setbacks
200 ft front, 150 ft side, 50 ft rear
Front setback measured from
The right-of-way line, not back of curb

Summary

Bartow County's Zoning Ordinance sets a different front, side and rear setback for every zoning district in Article VIII's Section 8.1.1 table. An A-1 or Rural Estate lot carries a 40-foot front, 10-foot side and 25-foot rear setback, while an R-1 residential lot carries a 25-foot front and rear setback with a 10-foot side setback.

These county ordinances apply to unincorporated areas of Bartow County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

8.1.1 Table. The following table summarizes area, yard and height requirements as stated in each individual zoning district in Article VII. ... District Area Width at Street R/W (existing road/new devt) Front setback (from property line) Side setback Rear setback Max building height 2 A-1 2 acres 150/100 1 40 10 25 50 RE-1 3 acres 7 150/100 1 40 10 25 50 RE-2 3 acres 7 150/100 1 40 10 25 50 R-1 15,000 sqft 3,7 150/75 1 25 8 10 25 8 50 ... C-1 26,000 sqft 100 40 20 20 75 I-1 1 acre 5 100 40 20 20 75 ... M-1 100 acres 200 150 50 50 75

Full Breakdown

Section 8.1.1 of the Zoning Ordinance summarizes the area, yard and height requirements for every zoning district in unincorporated Bartow County in a single table, with each individual district's own section in Article VII controlling if there is any conflict. The front setback is measured from the right-of-way line rather than the back of curb, and the table gives two lot-width figures, one for lots on an existing county road and one for lots created in a new subdivision. Under the table, A-1 Agricultural, RE-1 and RE-2 Rural Estate lots share a 40-foot front setback, a 10-foot side setback and a 25-foot rear setback, with a 50-foot maximum building height.

R-1 residential lots carry a 25-foot front setback, a 10-foot side setback and a 25-foot rear setback on a 15,000-square-foot minimum lot. C-1 General Business lots carry a wider 40-foot front, 20-foot side and 20-foot rear setback with a taller 75-foot maximum height, and I-1 General Industrial lots carry the same 40/20/20 setback pattern. M-1 Mining district lots need the largest buffer from neighbors: a 200-foot front setback, a 150-foot side setback and a 50-foot rear setback on a 100-acre minimum lot.

Violations & Fines

Building a house, garage, deck or other structure inside the required front, side or rear setback for its zoning district is a violation Community Development's code enforcement staff can order corrected or removed, and it can block issuance of a certificate of occupancy. The county measures the front setback from the right-of-way line, not the back of curb, so a driveway apron or mailbox post does not excuse an encroaching foundation or addition.

Frequently Asked Questions

How far back must a house sit from the property line on an A-1 lot in Bartow County?
Section 8.1.1 of the Zoning Ordinance sets the A-1 Agricultural district setback at 40 feet from the front right-of-way, 10 feet from each side property line and 25 feet from the rear property line, with a 50-foot maximum building height.
Are setbacks the same for every residential zoning district?
No. The Section 8.1.1 table gives R-1 lots a 25-foot front and rear setback with a 10-foot side setback, while A-1, RE-1 and RE-2 lots carry a larger 40-foot front setback. Commercial and industrial districts like C-1 and I-1 use a 40-foot front, 20-foot side and 20-foot rear setback.
Can Bartow County reduce a required setback?
Yes, on a limited basis. Section 5.4.3 of the Zoning Ordinance lets the Zoning Administrator grant an administrative variance of up to 20 percent off a development setback; anything beyond that reduction has to go to the Board of Zoning Appeals for a full variance.

Sources & Official References

Other rules in Bartow County

All Bartow County rules

Compare Bartow County to another location·View the Georgia building setbacks & zoning overview

Get notified when Setback Rules in Bartow County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.