Revere, MA Building Setbacks & Zoning: Setback Rules (2026)
Key Facts
- Front yard setback
- 20 feet
- Side/rear yard setback
- 50 feet
- Applies to
- Professional office park use
- By-right districts
- PDD2, TED
- Daily penalty
- Up to $300 per day
Summary
A professional office park in Revere must keep a 20-foot front yard and 50-foot side and rear yards, well beyond the setbacks Revere applies to most other commercial uses. The standard runs through Revere Municipal Code § 17.16.175 and applies wherever a professional office park use is allowed, by right or by special permit.
A professional office park erected, constructed, placed, altered, converted or otherwise changed, may be allowed by right in the PDD2 and TED districts and only by special permit in the RB, RC, RC1, RC2, RC3, PDD1, NB, GB, GB1, CB, HB, LI and IP districts by the city council in conformance with the dimensional and parking control requirements of this title, except as specifically changed by this section. ... The structure shall meet the following setback requirements: ... Twenty feet front yard; ... Fifty feet side and rear yard.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4804778; v14 updated 2026-05-04).
Full Breakdown
Revere Municipal Code § 17.16.175(E) sets a professional office park's yard requirements out as plain dimensional prose rather than a table entry: a twenty-foot front yard and a fifty-foot side and rear yard. The fifty-foot side and rear figure is unusually deep for Revere, a dense, mostly built-out coastal city where many commercial and industrial uses get by with side and rear yards in the range of five to twenty feet; it reflects the larger, five-acre-minimum parcels office parks are required to sit on and the buffering the city wants between office park activity and whatever abuts it.
The setback applies wherever a professional office park use is allowed, meaning by right in the PDD2 and TED districts and by special permit in the RB, RC, RC1, RC2, RC3, PDD1, NB, GB, GB1, CB, HB, LI and IP districts. Because an office park can be authorized by special permit in so many districts, the fifty-foot side and rear yard functions as the real buffer between an office campus and adjoining residential or lower-intensity commercial property, doing more work than the front yard figure in protecting neighboring uses. The site plan review committee reviews compliance with these setbacks before the city council can act on a special permit application, and the building inspector will not issue a building permit for a structure that encroaches on the required yard.
Violations & Fines
Building within the required 20-foot front yard or 50-foot side or rear yard for a professional office park violates § 17.16.175(E) and the Title 17 penalty in § 17.60.090, up to three hundred dollars per day per violation. The building inspector must also withhold the building permit under § 17.60.040 until the encroachment is corrected.
Frequently Asked Questions
What is the front yard setback for a Revere office park?
Why are office park side setbacks so much deeper than the front setback in Revere?
Do these setbacks apply outside professional office parks in Revere?
Sources & Official References
Other rules in Revere
Compare Revere to another location·View the Massachusetts building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Setback Rules in Nearby Cities
How other cities in this county handle setback rules.