Stormwater Management
Clinton Township's Drainage chapter bars connecting roof downspouts, footing drains or other surface runoff to the sanitary sewer and instead requires storm water to discharge at least five feet from every building wall. Section 1470.075 sets that mandatory discharge point, and the Department of Public Works enforces drainage standards under Chapter 1470.
Clinton Township Storm Drainage Discharge Rule
Some RestrictionsClinton Township Codified Ordinances § 1470.075(c)
All buildings, existing and proposed, shall be equipped with adequate eavestroughs, gutters and downspouts, splashguards, and similar connections, extended so as to discharge storm water through an impermeable structure or impermeable surface to a discharge point at least five feet (1-52/100 (1.52) meters) perpendicularly away from all building walls. The point of discharge to the grounds shall...
Erosion Control
Clinton Township requires every site-improvement plan to include adequate soil erosion and sedimentation control measures, both specified on paper and actually followed during construction. Code Section 1248.03(f) ties the requirement to Michigan's Natural Resources and Environmental Protection Act (NREPA, Act 451 of 1994) and names the Macomb County Public Works Office, not the Township, as the agency that issues soil erosion permits before grading or building starts.
Clinton Township Soil Erosion Control Rules
Some RestrictionsClinton Township Code of Ordinances § 1248.03(f)
(f) Adequate soil erosion and sedimentation control measures shall be specified on the plans, and followed during construction, to conform to the requirements of Act 451 of the Public Act of 1994, entitled Natural Resources and Environmental Protection Act as amended. The Macomb County Public Works Office is the jurisdictional agency responsible for issuing soil erosion permits in Clinton Tow...
Flood Zones
Clinton Township requires a development permit before anyone locates a structure or obstruction, or makes substantial improvements to one, on land in the 100-year flood plain. Public and private assembly buildings are barred from the flood plain outright.
Clinton Township Flood Plain Development Permit
Significant RestrictionsClinton Township Zoning Code § 1150.03(a)
(a) Except as hereinafter provided in this section, it shall be unlawful for any person to do any of the following without obtaining a development permit from the Charter Township of Clinton: (1) Locate any operation, obstruction or structure on lands in a 100-year flood plain. (2) Make substantial improvements to any obstruction or structure in a 100-year flood plain. Mainten...
Flood Elevation Requirements
New construction and substantial improvements in Clinton Township's flood hazard areas must have the lowest floor, including the basement, elevated at least one foot above the 100-year flood elevation. Work in the regulatory floodway also needs an engineer's certification that it will not raise flood heights.
Clinton Township Flood Elevation Freeboard Rule
Some RestrictionsClinton Township Zoning Code § 1150.07(c), (h)
(c) All new construction or substantial improvements shall be constructed by methods and practices that minimize flood damage and shall have the lowest floor, including the basement, elevated to at least one foot above the 100-year flood elevation. (h) Construction, substantial improvements and encroachments, including fill, are prohibited in a regulatory floodway unless certification by...