Building Safety in Dearborn, MI (2026)
6 verified building safety rules for Dearborn, Michigan, sourced directly from the municipal code and official government pages.
Verified from official government sources
Childcare Center Rules
Dearborn's Zoning Ordinance regulates group day care homes and child care centers as a distinct land use: a fenced outdoor play area of at least 50 square feet per child (2,000 sq. ft. minimum), frontage on a City-standard thoroughfare or collector, and a 25-foot minimum side yard setback, on top of state day care licensing.
Dearborn Child Care Center Site Rules
Some RestrictionsDearborn Zoning Ordinance § 7.02.G
G. Group day care home, child care center. The following regulations shall apply to group day care homes, child care centers, nursery schools, day nurseries, and pre-schools: 1. Licensing. In accordance with applicable state laws, all child care facilities shall be registered with or licensed by the Department of Social Services and shall comply with the minimum standards required for such faci...
Carbon Monoxide Detectors
Every short-term rental unit in Dearborn must have a working carbon monoxide detector of the type set by state law, plus smoke detectors and a fire extinguisher, under Code of Ordinances § 11-321, with owners checking each device every 90 days.
Dearborn STR Carbon Monoxide Detector Rule
Some RestrictionsDearborn Code of Ordinances § 11-321(a)-(e)
(a) Smoke detectors. The owner(s) and local agent of each STR shall each be responsible for the installation of smoke detectors/alarms in each STR. ... (c) Carbon monoxide detectors. The owner(s) and local agent of each STR shall each be responsible for the installation of a carbon monoxide detector in each rental unit. All carbon monoxide detectors shall be of the type described in MCL 125.1...
Building Permits
Dearborn requires a building permit and zoning review before you build a deck, and a separate Zoning Compliance Certificate with a site plan before you pour a concrete patio or other flatwork.
Dearborn Deck and Patio Permits
Some RestrictionsDearborn Zoning Ordinance §§ 2.03(D)(1), 2.20
§2.03.D.1: Accessory structures (for example, swimming pools, freestanding solar panels, tennis courts, antennas) require a building permit and review for zoning compliance... §2.20: In all cases, an application for a Zoning Compliance Certificate to install concrete flatwork shall be filed with the building official. The application shall be accompanied by a site plan...which illustrate the di...
Electrical Permits
Dearborn requires a permit from the Building and Safety Department before any electrical construction, alteration, or wiring in the city, issued only to a licensed electrician or contractor under the locally adopted 1999 National Electrical Code.
Dearborn Electrical Permit Required
Some RestrictionsDearborn Code of Ordinances § 5-1216
It shall be unlawful for any person to do or make any electrical construction, installation, alteration, wiring or repairs in or upon any building, structure, fixtures or apparatus in the city requiring the use of electric current, without exclusion for low voltage apparatus, without first obtaining a permit therefor from the department. Applications for such permit specifying the address where...
Plumbing Permits
Dearborn requires a plumbing license from the city clerk's office before any plumbing work begins, and adopts the State of Michigan's current Plumbing Code by reference as the technical standard for all plumbing work performed in the city.
Dearborn Plumbing Permit and License Rules
Some RestrictionsDearborn Code of Ordinances §§ 5-1306, 5-1307
There is hereby adopted by reference the current Plumbing Code adopted by the State of Michigan. A copy of such code shall be on file in the city clerk's office. ... No person shall engage in any plumbing work in the city unless such person has first procured a license from the city clerk's office, and paid the fee as listed in Chapter 12, Section 6.
Building Inspections
Dearborn requires permit holders to give the building and safety department 24 hours' notice before any required construction inspection, specifying address, permit number, and inspection type.
Dearborn Building Inspection Notice Rule
Some RestrictionsDearborn Code of Ordinances § 5-27(6) (amending Michigan Building Code § 113.2)
Section 113.2. Required inspections. It shall be the duty of the holder of every permit for a building or other structure or installation to notify the building and safety department, 24 hours prior to the time for which an appointment for inspection is being made, by giving the street address, permit number, and type of inspection requested. (7) Section 116.4. Violation penalties. Any per...
Looking for Wayne County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Dearborn city rules.
Building Safety in Wayne County →