Skip to main content
CityRuleLookup

Environmental Rules in Doral, FL (2026)

5 verified environmental rules for Doral, Florida, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

Doral runs a stormwater management utility under Chapter 47, Article II, billing every developed property a monthly fee based on impervious area. Single-family lots pay 1.0 equivalent residential units, multifamily units pay 0.6, and the fee is $4.00 per ERU. Unpaid fees become a lien after 60 days, with a 10 percent late charge and 8 percent annual interest.

Doral Stormwater Utility Fee Rules

Some Restrictions

Doral, Fla., Code of Ordinances §§ 47-25, 47-26

Stormwater management utility (SMU) fees are established and amended as necessary to be sufficient to plan, construct, operate, and maintain the stormwater management system, as required by F.S. § 403.0891(3). All lots and parcels subject to stormwater management utility fees in the city are divided into three classes as follows:(1)Single-family property. Each single-family property shall be co...

Erosion Control

Doral requires every construction site to keep the fronting roadway and rights-of-way clean of dirt, sediment and construction dust, and to maintain NPDES-compliant erosion and sedimentation best management practices under Code of Ordinances Sec. 30-4(3), including a construction entrance, storm drain inlet protection, and a staked silt fence.

Doral Construction Site Erosion Control Rules

Some Restrictions

Doral Code of Ordinances § 30-4(3)

Maintenance of the roadway and public rights-of-way. The roadway (to include private and public) and all public rights-of-way in front of a construction site shall be kept clean from dirt, sediment, and construction dust. The responsible party is to maintain the best management practices (BMP's) utilized to comply with the National Pollution Discharge Elimination System (NPDES) construction sit...

Flood Zones

Any development activity in a Doral flood hazard area, from grading to new construction, needs a floodplain development permit before work starts. Section 23-104.1 requires the owner or an authorized agent to apply to the floodplain administrator and the building official and to satisfy the Floodplain Management Ordinance before any permit is issued.

Doral Floodplain Development Permit Rules

Significant Restrictions

Doral, FL Code of Ordinances § 23-104.1

23-104.1 Permits required. Any owner or owner's authorized agent (hereinafter "applicant") who intends to undertake any development activity within the scope of this article, including buildings, structures and facilities exempt from the Florida Building Code, shall first make application to the floodplain administrator, and the building official if applicable, and shall obtain the required per...

Boat Dock Permits

Doral requires a permit before building a residential dock under City Code Section 74-285, with plans and specifications showing the structure's relationship to the seawall, property lines and adjoining properties. Once built, docks are capped at two slips, a 50-foot length from the seawall, and 1,000 to 1,500 square feet of dock area under Section 74-287.

Residential Dock Permit Rules in Doral

Some Restrictions

Doral, FL Code of Ordinances § 74-285

An applicant for a permit to construct a dock shall submit plans and specifications to the city. Such plans shall include the relationship of such structure to the property or seawall line and the relationship to adjoining properties.

Flood Elevation Requirements

Buildings in a Doral special flood hazard area must be elevated at least one foot above whichever is highest of three benchmarks: the base flood elevation, the back-of-sidewalk elevation, or the crown of the abutting road. Section 23-301.2(1)a layers this local one-foot freeboard on top of the Florida Building Code's minimum elevation standard.

Doral Base Flood Elevation Freeboard Rule

Significant Restrictions

Doral, FL Code of Ordinances § 23-301.2(1)a

(1)Additional elevation of buildings.a.For buildings located in the special flood hazard area, the minimum elevation requirements in the Florida Building Code shall be to or above the base flood elevation plus one foot, or the back of the sidewalk elevation plus one foot, or if there is no sidewalk, the elevation of the crown of the road or street abutting such building site plus one foot, whic...

Looking for Miami-Dade County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Doral city rules.

Environmental Rules in Miami-Dade County