Skip to main content
CityRuleLookup

Environmental Rules in Edmond, OK (2026)

5 verified environmental rules for Edmond, Oklahoma, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

Edmond funds its citywide stormwater drainage program with a monthly utility charge, $9.00 per Equivalent Service Unit as of 2026, billed on utility bills and administered by the City Manager under Title 23.

Edmond Stormwater Drainage Fee

Some Restrictions

Edmond Code of Ordinances § 23.30.030

Rate Schedule Effective January 1, 2026. The monthly service charge rate is hereby established at Nine Dollars ($9.00) for each Equivalent Service Unit assigned to a lot, tract, or parcel of real estate as herein provided. A. Residential Property. Residential property within the corporate limits of the City is hereby assigned one Equivalent Service Unit for each developed lot, tract, or parcel ...

Erosion Control

Developers and owners building in Edmond must design, install, and maintain erosion and sediment control BMPs before grading starts, and must hold both a City permit and the state's ODEQ OKR10 stormwater discharge permit.

Edmond Erosion & Sediment Control

Some Restrictions

Edmond Code of Ordinances § 23.20.040(i)

The Developer/Owner shall remain responsible for the design, installation, inspection, and continual maintenance of all erosion and sediment control Best Management Practices (BMPs). The Developer/Owner shall obtain the necessary permits from the Oklahoma Department of Environmental Quality (ODEQ) and the City of Edmond prior to any construction activities. Installation of erosion and sediment ...

Flood Zones

Any development inside an Edmond Area of Special Flood Hazard needs a Floodplain Development Permit from the Floodplain Administrator, and new construction is barred outright within the regulatory floodway itself.

Edmond Floodplain Development Permit

Significant Restrictions

Edmond Code of Ordinances § 23.40.090(A), (K)

A. A Floodplain Development Permit shall be required prior to development in any Area of Special Flood Hazard. ... K. Floodways are located within Areas of Special Flood Hazard and are extremely hazardous areas due to the velocities of floodwaters that carry debris, potential projectiles, and erosion potential. Therefore, encroachments are prohibited, including fill, new construction, substanti...

Vehicle Idling Restrictions

Near homes, Edmond bars delivery trucks from parking or idling between 10 p.m. and 6 a.m.: a sensitive-border condition on new multi-family and commercial development within 300 feet of platted single-family lots.

Edmond Delivery Vehicle Idling Limits

Some Restrictions

Edmond Code of Ordinances § 22.6.5(A), (B)(1)(b)

(A)Applicability. The following standards shall be met as a condition of approval of any specific use permit or site plan for new construction of multiple-family or nonresidential use located within 300 feet of any platted or developed single family residential property.(B)Hours of Operation.(1)Loading Operations.(a)No loading or unloading operations shall be conducted between the hours of 10:0...

Flood Elevation Requirements

Edmond requires two feet of freeboard: new construction and substantial improvements in a flood hazard area must have their lowest floor at least 2 feet above base flood elevation, certified by a licensed engineer or surveyor.

Edmond Flood Elevation Freeboard

Significant Restrictions

Edmond Code of Ordinances § 23.40.090(N)(8)

The lowest floor (including entry floor level, living areas, garage, basement, walk-out, electrical and mechanical equipment, and ductwork) must be elevated a minimum of two (2) feet above the base flood elevation. A registered professional engineer, architect, or land surveyor shall submit a completed Federal Emergency Management Agency Elevation Certificate to the Floodplain Administrator sho...