Skip to main content
CityRuleLookup

Environmental Rules in Elyria, OH (2026)

4 verified environmental rules for Elyria, Ohio, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

In the City of Elyria, Ohio, no person can discharge anything other than storm water into the MS4 or a watercourse. Section 960.14 lists the exempt discharges, such as lawn watering and non-commercial vehicle washing, and declares any other actual or threatened discharge a nuisance. Violations are a minor misdemeanor.

Elyria OH Illicit Storm Water Discharge Ban

Some Restrictions

Elyria Codified Ordinances § 960.14

(a) No person shall discharge or cause to be discharged into the MS4 or watercourses any materials other than storm water, including but not limited to, pollutants or waters containing any pollutants that cause or contribute to a violation of applicable water quality standards. (b) The commencement, conduct or continuance of any illicit discharge to the MS4 is prohibited except as described as ...

Erosion Control

In the City of Elyria, Ohio, any earth-disturbing activity that disturbs one or more acres, or moves 500 cubic yards or more of earth, needs a storm water permit from the City Engineer before work starts. The permit rests on an approved SWP3 with erosion and sediment controls that meet Ohio EPA standards.

Elyria, OH Construction Erosion and Sediment Control Permit

Some Restrictions

Elyria Codified Ordinances § 960.18

960.18 STORM WATER PERMITS. ... (a) A permit is required for any earth-disturbing activity that will: (1) Disturbs one or more acres of land; (2) Disturb less than one acre, but is part of a larger common plan of development or sale which will disturb one or more acres of land; or (3) Move 500 cubic yards or more of earth. (b) No earth-disturbing activities requiring a permit shall commence pri...

Flood Zones

In the City of Elyria, Ohio, Section 1386.14 makes it unlawful to begin construction, filling, grading or any other development in an identified special flood hazard area until a floodplain development permit is obtained. The City Engineer, as Floodplain Administrator, approves or disapproves within thirty days of a complete application.

Elyria Floodplain Development Permit Rules

Some Restrictions

Elyria Codified Ordinances § 1386.14

It shall be unlawful for any person to begin construction or other development activity including, but not limited to filling; grading; construction; alteration, remodeling, or expanding any structure; or alteration of any watercourse wholly within, partially within or in contact with any identified special flood hazard area, as established in Section 1386.06, until a floodplain development per...

Flood Elevation Requirements

In the City of Elyria, Ohio, new and substantially improved homes in a special flood hazard area must have the lowest floor, including basement, at or above the flood protection elevation. Section 1386.11 defines that elevation as the base flood elevation plus two feet of freeboard.

Elyria Flood Protection Elevation and Freeboard Rules

Some Restrictions

Elyria Codified Ordinances § 1386.28

(d) New construction and substantial improvement of any residential structure, including manufactured homes, shall have the lowest floor, including basement, elevated to or above the flood protection elevation. In Zone AO areas with no elevations specified, the structure shall have the lowest floor, including basement, elevated at least two feet above the highest adjacent natural grade. Support...

Looking for Lorain County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Elyria city rules.

Environmental Rules in Lorain County →