4 verified environmental rules for New Port Richey, Florida, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

New Port Richey controls what can be discharged into its storm sewer system to protect water quality, under its Stormwater Quality Management Ordinance.

New Port Richey Stormwater Discharge Rules

Some Restrictions

New Port Richey City Code § 11-65

Discharges to the county's MS4 shall be controlled to the extent that such discharge will not impair the operation of the MS4 or contribute to the failure of the MS4 to meet any local, state or federal requirements. Discharges to waters of the U.S. shall be controlled to the extent that the discharge will not adversely impact the quality or beneficial uses of the receiving water or result in vi...

Erosion Control

New Port Richey requires a state-licensed civil engineer's signed and sealed drainage plan, approved in writing by the city engineer, before the city issues a building permit for most new construction or building enlargements.

New Port Richey Drainage Plan Requirement

Some Restrictions

New Port Richey City Code § 6-26

A drainage plan prepared, signed and sealed by a civil engineer licensed in the state shall be submitted to the building official prior to the issuance of a building permit for the construction or enlargement of any building or structure except a one-and two-family dwelling. For one-or two-family dwelling, if the building official has reason to believe that there is an existing or potential dra...

Flood Zones

Any development within a mapped flood hazard area in New Port Richey requires a floodplain development permit under the city's Land Development Code, administered by the floodplain administrator using Pasco County's FEMA flood maps.

New Port Richey Flood Hazard Development Permit

Significant Restrictions

New Port Richey Land Development Code § 22.04.01

Any owner or owner's authorized agent (hereinafter "applicant") who intends to undertake any development activity within the scope of this ordinance, including buildings, structures and facilities exempt from the Florida Building Code, which is wholly within or partially within any flood hazard area shall first make application to the floodplain administrator, and the building official if appli...

Flood Elevation Requirements

In flood hazard areas of New Port Richey, Florida, Pasco County's largest Gulf-side city, the Land Development Code requires mechanical, electrical, and plumbing equipment to sit at least one foot above the design flood elevation, on top of Florida Building Code minimums.

New Port Richey Flood Zone Utility Elevation Rule

Some Restrictions

New Port Richey Land Development Code § 22.16.01(5)

(5) Have mechanical, plumbing, and electrical systems above the design flood elevation plus one (1) foot, except that minimum electric service required to address life safety and electric code requirements is permitted below the design flood elevation provided it conforms to the provisions of the electrical part of building code for wet locations.

Looking for Pasco County county-wide rules?

County ordinances apply to unincorporated areas and may supplement New Port Richey city rules.