Solar Energy in Owensboro, KY (2026)
1 verified solar energy rules for Owensboro, Kentucky, sourced directly from the municipal code and official government pages.
Verified from official government sources
Panel Permits
In the City of Owensboro, ground-mounted solar energy systems cannot exceed 20 feet in height, measured from the natural grade below each panel, under Appendix F Section 8.4, Note 59(a). Large Level 3 systems must also clear a 75-foot setback from project perimeter lines, a 150-foot buffer from any residential structure, and a 450-foot buffer for inverters, under Note 59(c). The Owensboro Metropolitan Planning Commission enforces both limits.
Solar Panel Siting Rules in Owensboro
Some RestrictionsOwensboro Zoning Ordinance, Appendix F § 8.4 (Note 59(a),(c))
59.Solar energy systems (SES) shall comply with the following criteria:a.The height of any ground mounted SES shall not exceed twenty feet (20') as measured from the highest natural grade below each solar panel (excludes utility poles and antennas constructed for the project). ... c.Setback requirements for Level 3 SES shall be as follows:1.All equipment shall be at least seventy-five (75) feet...
Looking for Daviess County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Owensboro city rules.
Solar Energy in Daviess County →