4 verified environmental rules for Schenectady, New York, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
Schenectady's municipal separate storm sewer system may carry only stormwater; § 148-24 bars discharging any other material into it, with narrow exemptions like groundwater and firefighting water, and violations enforced by the Stormwater Management Officer carry fines up to $1,000 and up to six months in jail.
Schenectady Bans Illegal Discharges Into Storm Sewers
Some RestrictionsSchenectady City Code § 148-24A (Discharge prohibitions)
Prohibition of illegal discharges. No person shall discharge or cause to be discharged into the MS4 any materials other than stormwater except as provided in Subsection A(1). The commencement, conduct or continuance of any illegal discharge to the MS4 is prohibited except as described as follows:
Erosion Control
Schenectady bars starting any land development activity without an approved stormwater pollution prevention plan (SWPPP) covering erosion and sediment control, reviewed by the responsible board or the Stormwater Management Officer; violators face a stop-work order and fines up to $250 per day under Chapter 148, Article I.
Schenectady Requires an Erosion Control Plan
Some RestrictionsSchenectady City Code § 148-4A (Applicability)
Except as otherwise provided herein, no person shall commence or perform any land development activity as defined in § 148-5 herein without the review and approval of a stormwater pollution prevention plan (SWPPP) by the responsible board and/or the Stormwater Management Officer.
Flood Zones
No construction, filling, or excavation may begin in Schenectady's FEMA-mapped flood hazard area without a floodplain development permit from the Building Inspector, the city's designated local administrator. Applicants pay a $50 fee and may be asked for a deposit of up to $500 to cover the city's review and inspection costs under City Code § 158-12.
Schenectady Floodplain Development Permit Required
Some RestrictionsCity of Schenectady Code § 158-12 (Ch. 158, Flood Damage Prevention)
A floodplain development permit is hereby established for all construction and other development to be undertaken in areas of special flood hazard in this community for the purpose of protecting its citizens from increased flood hazards and ensuring that new development is constructed in a manner that minimizes its exposure to flooding. It shall be unlawful to undertake any development in an ar...
Flood Elevation Requirements
New construction and substantial improvements to residential structures in Schenectady's mapped flood hazard zones must have their lowest floor, including any basement, elevated to at least two feet above the base flood elevation. City Code § 158-17 sets this two-foot freeboard standard for Zones A1-A30, AE and AH, going beyond FEMA's minimum at-BFE requirement.
Schenectady Flood Elevation: 2 Feet Above BFE
Some RestrictionsCity of Schenectady Code § 158-17A(1)
Elevation. ... The following standards apply to new and substantially improved residential structures located in areas of special flood hazard, in addition to the requirements in § 158-15A, Subdivision proposals, and § 158-15B, Encroachments, and § 158-16, Standards for all structures: ... Within Zones A1-A30, AE and AH, and also Zone A if base flood elevation data are available, new constructi...