Environmental Rules in Kings County, CA (2026)
4 county-level rules, plus city-specific rules for 1 city in Kings County, California.
Verified from official government sources
Stormwater Management
New commercial development in Armona, Home Garden, Kettleman City and Stratford must build onsite stormwater detention into its site plan, using features like catch basins, rain gardens or landscape depression basins.
Kings County Community Stormwater Detention Rule
Some RestrictionsKings County Development Code, Article 6 § 606.G
All new development within the communities of Armona, Home Garden, Kettleman City, and Stratford shall integrate onsite stormwater drainage features such as small catch basins, rain gardens, and landscape depression basins into their site plans to increase the stormwater detention throughout the community. C Commercial Art. 6 Zoning Districts ...
Erosion Control
Kings County has no standalone erosion-control ordinance; instead the Public Works Director must review and recommend an erosion and sedimentation control method before any new subdivision's tentative map can be approved.
Kings County Erosion Control Review
Some RestrictionsKings County Development Code, Article 23 § 2304.B
B. Public Works Department: It shall be the responsibility of the Public Works Director, acting upon the recommendation of the County Surveyor and Road Commissioner, to recommend approval, conditional approval or disapproval of Tentative Maps based upon evaluation of the improvements proposed by the developer. Recommendations on such improvements shall include: 1. Geom...
Flood Zones
Any construction, fill or alteration inside a FEMA-mapped special flood hazard area in unincorporated Kings County must fully comply with the county's Flood Damage Prevention chapter and clear a development permit before work begins.
Kings County Floodplain Development Permit Rules
Some RestrictionsKings County Code §§ 5A-5, 5A-7
This chapter shall apply to all areas of special flood hazard within the unincorporated territory of the County of Kings, State of California. ... No structure or land shall hereafter be constructed, located, extended, converted or altered without full compliance with the terms of this chapter and other applicable regulations.
Flood Elevation Requirements
New and substantially improved buildings in Kings County's mapped flood hazard areas must have their lowest floor built at or above the base flood elevation shown on the FEMA map: no extra freeboard cushion is required.
Kings County Flood Elevation Requirement
Some RestrictionsKings County Code §§ 5A-11, 5A-26(2)(c)(1)
Base flood elevation: (BFE) means the elevation shown on the Flood Insurance Rate Map for Zones AE, AH, A1—30, VE and V1—V30 that indicates the water surface elevation resulting from a flood that has a 1-percent or greater chance of being equaled or exceeded in any given year. ... New residential and nonresidential construction and substantial improvement of any structure shall comply with sect...
Environmental Rules by City in Kings County
1 cities in Kings County have their own environmental rules rules. Each link goes to that city's dedicated page with code citations.
All Kings County ordinances
See every category we cover for Kings County: parking, noise, fences, fires, animals, pools, and more.
Kings County Ordinance Hub →