Tempe, AZ Data Centers & Crypto Mining: Crypto Mining Rules (2026)
Key Facts
- Governing use
- Regulated as a "data center" use
- Allowed districts
- MU-ED, GID, HID only
- Approval needed
- Use permit under Section 6-308
- Residential buffer
- 500 feet from residential property line
- Generator rule
- Must be enclosed, ventilated for noise
- Extra study
- Economic impact study required
Summary
Tempe classifies crypto currency mining and processing operations as data centers under its Zoning and Development Code. That means a crypto mining facility can only open in the MU-ED, GID or HID zoning districts and needs a use permit approved by the city before it can operate.
A. Purpose and Applicability. The purpose of this section is to allow data centers in areas that limit the impact of identified innovation hubs and rail corridors where job employment growth and commerce are desired... Data centers are allowed in the MU-ED, GID and HID zoning districts only, subject to approval of a use permit, pursuant to Section 6-308. B. Location Requirements. 1. Data center buildings shall not be located within 500 feet of the property line of a site containing a residential use or a residential district. 2. Generators for data centers shall be located within an enclosed building with necessary ventilation to reduce impacts on noise to surrounding area.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: City Code: Supplement 33 Update 4 | Zoning and Development Code: Supplement 11 Update 2).
Full Breakdown
Tempe's Zoning and Development Code does not carve out a separate ordinance for crypto mining, it folds the activity into the definition of a data center. Section 7-105 defines a data center as a facility housing computer systems and associated components, and expressly lists "crypto currency mining/processing" among the equipment types covered, alongside servers, GPUs and cloud computing hardware. Once a crypto mining operation meets that definition, it is regulated under Section 3-429, the code's dedicated data center standards. That section restricts data centers to the MU-ED (Mixed Use Employment District), GID (General Industrial District) and HID (Heavy Industrial District) zoning districts only, and requires approval of a use permit under Section 6-308 before the facility can be built or occupied.
Two siting rules apply directly to the physical footprint of a mining operation: the building housing the equipment cannot sit within 500 feet of the property line of any site with a residential use or residential zoning district, and any generators serving the facility must be enclosed in a building with ventilation designed to cut down on noise reaching neighboring properties. Applicants also face a substantive approval hurdle beyond the standard use permit criteria in Section 6-308(E): they must submit an economic impact study for review by the Economic Development Director (or designee) addressing the facility's effect on innovation hub or rail corridor job growth.
If the operation qualifies as an "extreme water use" facility, a water use plan must also be filed with the Public Works Department under Tempe City Code Section 33-142, since crypto mining rigs and their cooling systems can be heavy water and power draws. There is no outright ban and no city-specific moratorium language in the code text; the restriction operates entirely through the zoning district limitation, the 500-foot residential buffer, and the discretionary use permit and study requirements layered on top.
Violations & Fines
Operating a crypto mining or data center use outside the MU-ED, GID or HID districts, or without an approved use permit under Section 6-308, is a zoning code violation subject to the city's standard zoning enforcement process, including stop-work orders and civil citations for unpermitted use of land. Development Review Division staff and Code Compliance handle enforcement; a facility built inside the 500-foot residential buffer or lacking the required economic impact study or water use plan can have its use permit denied or later revoked on appeal to the Board of Adjustment.
Frequently Asked Questions
Does Tempe have a separate crypto mining ordinance?
Where in Tempe can a crypto mining facility legally locate?
How close can a crypto mining facility be to a house?
Do generators for a mining rig need special enclosures?
Sources & Official References
Other rules in Tempe
Compare Tempe to another location·View the Arizona data centers & crypto mining overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Crypto Mining Rules in Nearby Cities
How other cities in Maricopa County handle crypto mining rules.