Tempe, AZ Data Centers & Crypto Mining: Data Center Noise Limits (2026)
Key Facts
- Generator noise control
- Enclosed building, adequate ventilation
- Residential buffer
- 500 feet minimum
- Allowed districts
- MU-ED, GID, HID only
- Entitlement required
- Use permit under Section 6-308
- Added by
- Ordinance O2025.23, effective 7-1-2025
Summary
Tempe's Zoning and Development Code requires data center generators to sit inside an enclosed, ventilated building specifically to cut noise reaching neighbors, and keeps data center buildings themselves at least 500 feet from any residential use or residential district under Section 3-429(B). The rule applies only in the MU-ED, GID and HID districts where data centers are allowed with a use permit.
A.Purpose and Applicability. the purpose of this section is to allow data centers in areas that limit the impact of identified innovation hubs and rail corridors where job employment growth and commerce are desired... design standards adopted to mitigate noise levels. data centers are allowed in the mu-ed. gid and hid zoning districts only, subject to approval of a use permit, pursuant to section 6-308.B.Location Requirements.1.Data center buildings shall not be located within 500 feet of the property line of a site containing a residential use or a residential district.2.Generators for data centers shall be located within an enclosed building with necessary ventilation to reduce impacts on noise to surrounding area.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: City Code: Supplement 33 Update 4 | Zoning and Development Code: Supplement 11 Update 2).
Full Breakdown
Section 3-429 was added to the Zoning and Development Code by Ordinance No. 23, effective July 1, 2025, to steer data centers into the city's innovation hubs and rail corridors while limiting neighborhood impact. Data centers are allowed only in the MU-ED, GID and HID zoning districts, and only after approval of a use permit under Section 6-308. Section 3-429(B)(1) sets a flat 500-foot buffer between any data center building and the property line of a site with a residential use or residential zoning district.
Section 3-429(B)(2) targets the loudest equipment specifically: generators serving a data center must sit inside an enclosed building with ventilation adequate to reduce the noise impact reaching the surrounding area, rather than running in open yards or on exposed pads. Section 3-429(A) folds these location and design rules into a broader purpose clause calling for design standards adopted to mitigate noise levels alongside energy and water consumption controls. Beyond noise, Section 3-429(C) requires an economic impact study reviewed by the Economic Development Director for any proposed innovation-hub or rail-corridor site, and any data center meeting the code's definition of an extreme-water-use facility must also submit a water use plan to the Public Works Department under Tempe City Code Section 33-142 before a use permit can be granted.
Violations & Fines
A data center that runs generators in the open, without an enclosed and ventilated housing, or that locates within 500 feet of a residential property line, violates Section 3-429(B) and Section 1-201 of the Code. The city can issue a civil citation carrying a $100 to $1,000 fine per day of noncompliance or prosecute it as a class 1 misdemeanor with up to a $2,500 fine and six months in jail, and a noncompliant use permit can be revoked.
Frequently Asked Questions
Does Tempe set a decibel limit for data center noise?
Where can a data center locate in Tempe?
Can a data center run generators outdoors in Tempe?
Sources & Official References
Other rules in Tempe
Compare Tempe to another location·View the Arizona data centers & crypto mining overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Data Center Noise Limits in Nearby Cities
How other cities in Maricopa County handle data center noise limits.