York County, VA Data Centers & Crypto Mining: Data Center Noise Limits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
York County Code § 24.1-489.1(f)
Noise cap
55 dBA or 65 dBC, whichever greater
Measured at
Property boundary
Generator testing window
Mon-Fri, 5-8 p.m.
Pre-approval requirement
Ambient noise sound study

Summary

York County caps data center noise at fifty-five A-weighted decibels and sixty-five C-weighted decibels, measured at the property boundary, or the existing ambient level from a required sound study, whichever is greater. Code § 24.1-489.1(f) also limits on-site generator testing to weekday evenings and requires a pre-development sound study.

These county ordinances apply to unincorporated areas of York County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(f)Data centers shall adhere to the following noise standards(1)A sound study evaluating existing ambient noise prior to project development and modelling predicted noise generation after development, shall be submitted. ... (2)Data centers and associated ancillary equipment shall not produce any sound that exceeds the existing ambient noise captured in the sound study or fifty-five A-weighted decibels (55 dBA) and sixty-five C-weighted decibels (65 dBC), whichever is greater, when measured from the boundary of the property on which it operates. ... (4)Data centers shall only be permitted to engage in on-site generator testing one generator at a time on Monday through Friday from the hours of 5:00 PM to 8:00 PM.

Full Breakdown

York County, Virginia regulates data center noise under Code § 24.1-489.1(f), part of the special use permit standards for these facilities. Before a data center can be approved, the applicant must submit a sound study that measures existing ambient noise, taken between 11:00 p.m. and 5:00 a.m. from at least four corners of the property or other locations the Zoning Administrator sets, and models the noise the completed facility, including its generators and ancillary equipment, is predicted to add. Once operating, the data center and its ancillary equipment cannot produce sound that exceeds the ambient level captured in that study, or fifty-five A-weighted decibels (55 dBA) and sixty-five C-weighted decibels (65 dBC), whichever number is greater, measured from the boundary of the property where the facility sits.

The Zoning Administrator can order additional sound studies after the facility starts operating, at the owner or lessee's expense, to confirm it still meets the noise ordinance and this subsection. All mechanical equipment must stay in good condition and run with a fully operational muffler or other noise-attenuating device where the manufacturer includes one or the sound study required one to hit the decibel limits. Generator testing is tightly limited: only one generator can be tested at a time, and only Monday through Friday between 5:00 p.m. and 8:00 p.m.; outside of testing or commissioning, generators are for backup and emergency use only.

These noise standards apply on top of the required 100-foot non-residential and 500-foot residential structure setbacks and the fifty-foot Type 50 buffer required elsewhere in § 24.1-489.1.

Violations & Fines

A data center that exceeds 55 dBA or 65 dBC at the property boundary, whichever is greater than the ambient level in its sound study, violates § 24.1-489.1(f)(2), and the Zoning Administrator can order a follow-up sound study at the owner's expense to confirm compliance. Testing more than one generator at a time, or running generator tests outside the Monday-through-Friday 5:00 p.m. to 8:00 p.m. window, also violates the ordinance's generator-testing limits.

Frequently Asked Questions

What is the noise limit for a data center in York County?
Fifty-five A-weighted decibels or sixty-five C-weighted decibels, whichever is greater than the ambient noise level from the required sound study. Code § 24.1-489.1(f)(2) measures that limit from the boundary of the property where the data center operates.
Does a data center need a noise study before it can open in York County?
Yes. Section 24.1-489.1(f)(1) requires a sound study measuring existing ambient noise between 11:00 p.m. and 5:00 a.m. at a minimum of four property corners, plus modeling of the noise the finished facility and its generators are expected to add, submitted with the special use permit application.
When can a York County data center test its backup generators?
Only Monday through Friday from 5:00 p.m. to 8:00 p.m., and only one generator at a time. Section 24.1-489.1(f)(4) limits generator use outside that testing window to backup and emergency situations only.

Sources & Official References

Other rules in York County

All York County rules

Compare York County to another location·View the Virginia data centers & crypto mining overview

Get notified when Data Center Noise Limits in York County, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.