Bellflower, CA Data Centers & Crypto Mining: Data Center Zoning & Siting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified July 2026

Key Facts

Dedicated ordinance
None
Industrial zone
M-1 Light Industrial only
Industrial land
About 4% of city
Permit path
Planning Commission similar-use finding
Generating plants
Conditional Use Permit required

Summary

Bellflower has no data-center ordinance and no "data center" use category. The city has one industrial zone, M-1 Light Industrial, covering 4% of its 6.14 square miles. A server building needs a Planning Commission similar-use determination.

The following uses only shall be permitted in the M-l, Light Industrial District unless as may be otherwise provided for in this title:

A. Any use permitted in the C-G District, provided it complies with all regulations applicable to said C-G District.

B. The following uses if conducted wholly within a completely enclosed building, and subject to the following conditions: Neither drop hammers nor punch presses in excess of five ton capacity shall be permitted. Open storage is permitted on rear half of lot (subject to the conditions of Chapter 17.72). These uses are:

1. Assembly of:

a. Electrical appliances.

b. Electronic instruments, phonographs, television sets, including manufacturing of small parts such as coils, condensers, transformers or crystal holders.

2. Manufacturing, assembly, compounding or treating of articles or merchandise from the following previously prepared materials:

a. Bone.

b. Canvas.

c. Cellophane.

d. Cloth.

e. Felt.

f. Fur.

g. Glass.

h. Leather (except machine belting).

i. Paper.

j. Plastics (only from previously molded materials).

k. Textiles.

l. Yarn.

3. The manufacture of ceramic products, provided that each kiln is limited to 18 cubic feet capacity.

4. The manufacture of scientific instruments or equipment.

5. The following uses:

(1) Accessory buildings and uses customarily incidental to any of the above uses when located on the same lot.

(2) Addressograph service.

(3)

Source: Bellflower Municipal Code, Title 17 Zoning & Chapter 8.32 NoiseView official code

Full Breakdown

Bellflower Municipal Code Section 17.52.020 opens "The following uses only shall be permitted in the M-1, Light Industrial District." That list is closed and names no data center, server farm, or colocation use. M-1 also permits any C-G General Commercial use, and Section 17.44.020(C) lets the Planning Commission approve uses substantially similar to those listed. A data center reaches Bellflower through that similar-use finding, plus Development Review and CEQA. Section 17.52.160 requires all uses inside a completely enclosed building. Backup generation matters: Section 17.52.030(F) makes electric generating plants a Conditional Use Permit. The city has 17 zones and under 160 acres of industrial land, so sites are scarce.

Violations & Fines

Operating a data center outside M-1, without the Planning Commission similar-use determination, or without a Conditional Use Permit for on-site generating plants, is a zoning violation enforced by Bellflower Code Enforcement.

Frequently Asked Questions

Where can a data center be built in Bellflower?
Only in the M-1 Light Industrial zone, the city's single industrial district, which covers about 4% of Bellflower's 6.14 square miles. All uses must be conducted wholly within an enclosed building under Section 17.52.160.
Does Bellflower have a data center ordinance?
No. Neither Title 17 nor any adopted ordinance defines or regulates data centers by name. The M-1 permitted-use list is closed, so a server building requires a Planning Commission determination that it is substantially similar to a listed use.
How do residents weigh in on a Bellflower data center?
Bring it to the Planning Commission and City Council. The Planning Division is at 16600 Civic Center Drive, (562) 804-1424. Details at https://bellflower.ca.gov/departments/planning/index.php.

Sources & Official References

Other rules in Bellflower

All Bellflower rules

California rules heatmap·Compare Bellflower to another location·View the California data centers & crypto mining overview

Get notified when Data Center Zoning & Siting in Bellflower, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Data Center Zoning & Siting in Nearby Cities

How other cities in Los Angeles County handle data center zoning & siting.

Long Beach, CA
Light Restrictions
Los Angeles, CA
Some Restrictions
El Monte, CA
Some Restrictions
Pasadena, CA
Some Restrictions
Torrance, CA
Some Restrictions
Palmdale, CA
Some Restrictions
Lakewood, CA
Some Restrictions
Norwalk, CA
Some Restrictions