Key Facts

Allowed zones
M-1 and M-1A only
M-2 heavy manufacturing
Not a listed use
M-1A cooling condition
Closed-loop system required
Citywide water cap
200,000 gal/day average
Water cap sunset
Effective until Sept 20, 2026

Summary

Data centers are permitted only in Salt Lake City's M-1 and M-1A manufacturing districts, and the M-1A location requires a closed-loop cooling system under the zoning use table.

Data center P19 [M-1] / P19, 23 [M-1A] ... 23. Data centers may be permitted provided they utilize a closed-loop cooling system. ... Any new non-residential land use that consumes or uses more than an annual average of two hundred thousand (200,000) gallons of potable water per day is prohibited in all zoning districts.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-21: Code current through: Ord. 40-26, passed June 16, 2026).

Full Breakdown

The manufacturing-districts use table lets data centers locate in the M-1 (Light Manufacturing) and M-1A (Northpoint Light Industrial) zones as a permitted use; they are not listed for M-2 (Heavy Manufacturing) at all. In M-1A, qualifying provision 23 adds a hard technical condition: the facility must use closed-loop cooling. Every data center is also subject to the citywide potable-water cap in Section 21A.33.010.D.1, which bars any new or expanded non-residential land use from consuming more than a 200,000-gallon daily average, a limit set with high-water-use uses like data centers in mind and effective through September 20, 2026.

Violations & Fines

Siting outside M-1/M-1A or skipping required review is an unpermitted use; violating the water-use cap or cooling condition is a city ordinance violation, a class B misdemeanor punishable by up to a $1,000 fine (corporations up to $5,000) per Section 1.12.050.

Frequently Asked Questions

Can a data center locate in any industrial zone in Salt Lake City?
No. The zoning table permits data centers only in the M-1 and M-1A districts; M-2 heavy manufacturing does not list the use at all.
Does a Salt Lake City data center need special cooling equipment?
In the M-1A Northpoint Light Industrial District, yes: qualifying provision 23 requires a closed-loop cooling system as a condition of permitting the use.
Is there a water-use limit that affects data centers?
Yes. Section 21A.33.010.D.1 bars any new or expanded non-residential use, including data centers, from averaging over 200,000 gallons of potable water per day.

Sources & Official References

Other rules in Salt Lake City

All Salt Lake City rules

Compare Salt Lake City to another location·View the Utah data centers & crypto mining overview

Get notified when Data Center Zoning & Siting in Salt Lake City, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Data Center Zoning & Siting in Nearby Cities

How other cities in Salt Lake County handle data center zoning & siting.

West Jordan, UT
Some Restrictions