Tigard, OR Data Centers & Crypto Mining: Data Center Zoning & Siting (2026)
Key Facts
- Use category
- Basic Utility (Section 18.60.050)
- Zones with the upper-story condition
- COM, MUC, MUE, MUR and IND
- Where a data center can sit
- On or above the second story
- Building type required
- Mixed-use development (vertical mixed-use building in IND)
- Approval
- Conditional use, Hearings Officer, Chapter 18.740
- Class 1 penalty
- Not to exceed $250 per day
Summary
In the City of Tigard, Oregon, a data center is a Basic Utility, and the COM, MUC, MUE and MUR commercial zones conditionally allow data centers only on or above the second story of a mixed-use development. The Hearings Officer decides each one through the conditional use process in Chapter 18.740, using discretionary criteria.
D. COM Zone Use restrictions. ... 2. Basic Utility. a. This use is conditionally allowed. b. Data centers are conditionally allowed only on or above the second story of a mixed-use development. ... E. MUC Zone Use restrictions. 1. Basic Utility. a. This use is conditionally allowed. b. Data centers are conditionally allowed only on or above the second story of a mixed-use development.
Full Breakdown
Tigard treats a data center as a Basic Utility. Section 18.60.050 defines Basic Utility as an infrastructure service that must be located in or near where the service is provided, and its examples name water towers or reservoirs, data centers, energy production including solar production as a standalone use, and power substations. In the commercial zone table, Table 18.120.1, Basic Utility carries an R/C rating in each of the COM, MUC, MUE and MUR zones. The use restrictions in Section 18.120.030 turn that rating into two rules: the use is conditionally allowed, and data centers are conditionally allowed only on or above the second story of a mixed-use development. The COM, MUC, MUE and MUR zones each print that data center sentence in the same words.
The code defines a mixed-use development in Section 18.30.020 as a multi-story building with a residential use on the upper stories and civic, commercial, or industrial uses on at least the first story. A conditional use needs the approval of the Hearings Officer using discretionary criteria, and Section 18.120.030.A sends the approval process and criteria to Chapter 18.740, Conditional Uses.
Other districts carry a matching condition. The IND industrial zone, in Section 18.130.030.C, conditionally allows data centers only on or above the second story of a vertical mixed-use building. The Downtown plan district in Section 18.650.050 and the Washington Square Regional Center plan district in Section 18.670.050 also print an upper-story condition for data centers. These rules apply in the City of Tigard only. Beaverton, Tualatin, King City and unincorporated Washington County apply their own codes.
Violations & Fines
Building or operating a data center outside the conditions above, or without the Hearings Officer's conditional use approval, violates the Community Development Code. Section 18.20.040 makes it unlawful, declares it a nuisance and a Class I Civil Infraction under Title 6, and counts each day as a separate infraction. Section 1.16.640 caps a Class 1 penalty or administrative fee at $250 per day, and Section 1.16.650 quadruples the maximum for a third repeat within 24 months.
Frequently Asked Questions
Can a data center be a standalone building in a Tigard commercial zone?
Who approves a data center in the City of Tigard?
Does the IND industrial zone treat data centers differently?
What is the penalty for an unapproved data center in Tigard?
Sources & Official References
Other rules in Tigard
Compare Tigard to another location·View the Oregon data centers & crypto mining overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.