Skip to main content

Dixmont, ME Environmental Rules: Boat Dock Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Temporary pier or dock
Code Enforcement Officer permit (Table 1, item 15a)
Permanent pier or dock
Planning Board permit (Table 1, item 15b)
Structures per lot
One; a second if lot has twice the minimum shore frontage
Temporary dock width
No wider than six feet for non-commercial uses
Height of structures on a dock
No more than 20 feet above the dock
State permit
Department of Environmental Protection, Natural Resources Protection Act

Summary

Dixmont's Shoreland Zoning Ordinance limits a lot to one structure below the high-water line, with a Code Enforcement Officer permit for temporary piers and docks and a Planning Board permit for permanent ones. A temporary dock for non-commercial use cannot be wider than six feet. New permanent piers and docks are not permitted unless a temporary dock is shown to be infeasible and the state has issued a permit.

(1) No more than one structure extending or located below the normal high-water line of a water body or within a wetland is allowed on a single lot; except that when a single lot contains at least twice the minimum shore frontage as specified in Section 15(A), a second structure may be allowed and may remain as long as the lot is not further divided. ... (5) The facility shall be no larger in dimension than necessary to carry on the activity and be consistent with the surrounding character and uses of the area. A temporary pier, dock or wharf shall not be wider than six feet for non-commercial uses. ... (7) New permanent piers and docks shall not be permitted unless it is clearly demonstrated to the Planning Board that a temporary pier or dock is not feasible, and a permit has been obtained from the Department of Environmental Protection, pursuant to the Natural Resources Protection Act.

Full Breakdown

Dixmont regulates piers, docks and wharves through Section 15(C) and Table 1 of its Shoreland Zoning Ordinance, adopted March 19, 2016. The ordinance applies to land within 250 feet of great ponds and freshwater wetlands and within 75 feet of streams, and it also reaches any structure built on, over or abutting a dock, wharf or pier. The town has no general zoning ordinance.

Table 1, item 15, covers piers, docks, wharfs, bridges and other structures below the normal high-water line or within a wetland. A temporary structure is marked CEO in all three districts, meaning a permit from the Code Enforcement Officer. Footnote 8 excludes bridges and other crossings not involving earthwork, which need no permit. A permanent structure is marked PB in all three districts, meaning a permit from the Planning Board.

Section 15(C) sets the standards. Only one structure below the normal high-water line or within a wetland is allowed on a single lot, except that a lot with at least twice the minimum shore frontage can have a second structure for as long as the lot is not further divided. Access from shore must be on soils appropriate for the use and built to control erosion. The location cannot interfere with existing developed or natural beach areas and must minimize adverse effects on fisheries. The facility can be no larger than necessary and must be consistent with the surrounding character and uses. No new structure can be built on, over or abutting a pier unless it requires direct access to the water as an operational necessity, and existing structures on a pier cannot be converted to residential dwelling units in any district. Structures on a pier cannot rise more than 20 feet above it.

A structure built on a float is prohibited unless it is designed to function as, and is registered with the Maine Department of Inland Fisheries and Wildlife as, a watercraft. New permanent structures projecting into or over water also need a Department of Environmental Protection permit under 38 M.R.S.A. section 480-C, and the Army Corps of Engineers can require a permit in navigable waters.

Violations & Fines

The Code Enforcement Officer enforces the ordinance. Under Section 16(I), a violation is deemed a nuisance, the officer orders correction in writing, and the municipal officers then bring legal action, including injunctions and fines under 30-A M.R.S.A. section 4452. The printed note lists fines of not less than $100 nor more than $2500 per violation for each day the violation continues, with a $5000 maximum in a resource protection district.

Frequently Asked Questions

Do I need a permit for a dock on a Dixmont pond?
Yes in the shoreland zone. Table 1, item 15 requires a Code Enforcement Officer permit for a temporary pier or dock and a Planning Board permit for a permanent one, in all three districts. Bridges and crossings not involving earthwork need no permit. New permanent structures also need a Department of Environmental Protection permit.
Can I build a permanent dock in Dixmont?
Only after clearing a high bar. Section 15(C)(7) says new permanent piers and docks are not permitted unless it is clearly demonstrated to the Planning Board that a temporary pier or dock is not feasible, and a permit has been obtained from the Department of Environmental Protection under the Natural Resources Protection Act.
How wide can a temporary dock be in Dixmont?
A temporary pier, dock or wharf cannot be wider than six feet for non-commercial uses. Section 15(C)(5) also requires any facility to be no larger in dimension than necessary to carry on the activity and consistent with the surrounding character and uses of the area.
How many docks can one Dixmont lot have?
One structure extending or located below the normal high-water line or within a wetland. A second structure is allowed only when the single lot contains at least twice the minimum shore frontage specified in Section 15(A), and it can remain only as long as the lot is not further divided.

Sources & Official References

Other rules in Dixmont

All Dixmont rules

Compare Dixmont to another location·View the Maine environmental rules overview

Get notified when Boat Dock Permits in Dixmont, ME changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.