Key Facts

Permit trigger
Any dock in a special flood hazard area
Permitting authority
County Floodplain Administrator, § 154.27
Floodway docks
Require no-rise analysis, § 154.49(B)
Sanitary requirement
Toilet and covered waste facilities, § 50.19(B)
No-wake buffer
100 ft. from boat docks (Ririe/Palisades)
Maximum penalty
$500 fine or 180 days jail

Summary

A boat dock counts as regulated development under Bonneville County's floodplain chapter. Building or altering one within a special flood hazard area requires a floodplain development permit, and a dock that encroaches into a mapped floodway faces additional no-rise engineering requirements.

These county ordinances apply to unincorporated areas of Bonneville County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

A floodplain development permit shall be required in conformance with the provisions of this chapter prior to the commencement of any development activities within special flood hazard areas... A complete description of all the development to be permitted under the floodplain development permit (i.e., house, garage, pool, septic, bulkhead, cabana, pole barn, chicken coop, pier, bridge, mining, dredging, filling, rip-rap, docks, grading, paving, excavation or drilling operations or storage of equipment or materials and the like)... Docks, piers, boat ramps, marinas, moorings, decks, docking facilities, port facilities, shipbuilding and ship repair facilities that encroach into regulated floodways shall meet the limitations of this section.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-1: Ordinance 280-26, passed 1-20-2026).

Full Breakdown

28(B)(1) spells out that "docks" fall within the development the permit covers, listed alongside houses, garages, pools, bulkheads and grading work. 28(A). 49(B) adds a stricter layer: no encroachment, including new construction, is permitted unless the owner demonstrates through hydrologic and hydraulic analysis that it causes no rise in base flood levels, or FEMA has approved a conditional letter of map revision. 19(B) requires that every dock servicing watercraft in the county have conveniently located toilet facilities for men and women and covered garbage and waste facilities, tying dock use to the county's water pollution rules banning discharge of sewage or refuse from watercraft into county waters. 22.

Violations & Fines

Building or altering a dock in a special flood hazard area without the required floodplain development permit, or without meeting the no-rise floodway standard, is a misdemeanor under § 154.99: a fine of not more than $500, imprisonment of not more than 180 days, or both, with each day of continuing violation a separate offense. The Floodplain Administrator may also issue a corrective notice under § 154.29 ordering the dock altered, relocated or removed within 60 to 180 days, appealable to the county's governing body within ten days.

Frequently Asked Questions

Do I need a permit to build a boat dock in Bonneville County?
Yes, if the dock is within a mapped special flood hazard area. Section 154.27 requires a floodplain development permit before any development activity there, and § 154.28(B)(1) lists docks among the development types the permit application must describe.
Are there extra rules if my dock is in a floodway?
Yes. Section 154.49(B) bars encroachments, including docks, piers and boat ramps, unless a hydraulic no-rise analysis shows no increase in base flood levels or FEMA has issued a conditional letter of map revision covering the project.
Does my dock need bathroom facilities?
If it services watercraft, § 50.19(B) requires conveniently located toilet facilities for men and women plus covered garbage and waste facilities, tied to the county's ban on discharging sewage or refuse from boats into county waters.
What if I skip the permit?
That is a misdemeanor under § 154.99, carrying a fine of up to $500 or up to 180 days in jail, with each day of noncompliance counted as a separate offense, plus a corrective order from the Floodplain Administrator under § 154.29.

Sources & Official References

Other rules in Bonneville County

All Bonneville County rules

Compare Bonneville County to another location·View the Idaho environmental rules overview

Get notified when Boat Dock Permits in Bonneville County, ID changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.