Macon-Bibb County, GA Environmental Rules: Boat Dock Permits (2026)
Key Facts
- Permit application to
- Manager, Tobesofkee Recreation Area
- Reviewing agencies
- County Engineering, Business Development Services
- Minimum shoreline frontage
- 100 feet at 360-foot contour
- Maximum dock extension
- 40 feet or 10-foot depth, shorter
- Permit expiration
- 6 months if construction not started
Summary
Macon-Bibb County requires a construction permit application to the Tobesofkee Recreation Area Manager before building a dock, boathouse or seawall at Lake Tobesofkee, with strict frontage, length and height limits set in Code Section 17-55.
(c)Application.(1)A person desiring to construct a dock or boathouse, either or both shall first make application to the Manager of the Tobesofkee Recreation Area on application forms provided by the same.(d)Requirements.(2)A dock or boathouse shall not be constructed where there is less than 100 feet of frontage at the 360-foot contour line. The shoreline will be measured from pin to pin.(4)No dock shall be constructed any longer than is necessary to reach from the 360-foot contour line to a horizontal length of 40 feet, nor longer than is necessary to reach a ten-foot depth of water vertically, whichever is the shorter distance. As an additional limitation, no dock shall be constructed in such manner as to occupy in length or breadth more than 25 percent of the width of a slough or cove.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Comprehensive Land Development Resolution: Supplement 4 | Code of Ordinances: Supplement 20).
Full Breakdown
Section 17-55 governs docks, boathouses and seawalls along the county-owned Tobesofkee Recreation Area shoreline. An applicant must first submit an application to the Manager of the Tobesofkee Recreation Area, including the proposed location, length and height of the structure and construction plans and specifications adequate for the department of business development services to confirm code compliance. The Manager forwards the application to the Macon-Bibb County Engineering Department for a site visit and location review; only after engineering approval does business development services examine construction-code compliance and issue the construction permit, subject to fees under that department's procedures.
Section 17-55(d) then layers on numeric limits: no dock or boathouse may be built where there is less than 100 feet of shoreline frontage at the 360-foot contour line, measured pin to pin; a dock cannot extend more than 40 feet from that contour line or reach a water depth greater than ten feet, whichever distance is shorter; and no dock may occupy more than 25 percent of the width of a slough or cove. Floating docks and boathouses are barred outright, only one dock or boathouse is allowed per lot, and permit holders must also carry the separate annual permit required by Section 17-54 for any dock or boathouse below the 369-foot contour line. If construction does not substantially begin within six months of final approval, the permit expires and a new application is required.
Violations & Fines
Building or replacing a dock, boathouse or seawall at Lake Tobesofkee without both the Section 17-55 construction permit and the Section 17-54 annual permit is a violation subject to citation by Tobesofkee Recreation Area staff, and the director of business development services may order removal of an unsafe or noncompliant structure at the owner's expense after 60 days' written notice.
Frequently Asked Questions
Where do I apply to build a dock at Lake Tobesofkee?
How far can a dock extend into Lake Tobesofkee?
Do I need more than one permit to keep a boathouse at the lake?
Sources & Official References
Other rules in Macon-Bibb County
Compare Macon-Bibb County to another location·View the Georgia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.