Bloomington, IN Environmental Rules: Erosion Control (2026)
Key Facts
- Applies to
- All land-disturbing activity, any size
- Stabilization start
- Within 7 idle days
- Stabilization finish
- Within 14 days of starting
- Natural buffer minimum
- 50 feet preserved where existing
- First-offense fine
- Up to $2,500
- Stop-work notice
- 72 hours (immediate for hazards)
Summary
In the City of Bloomington, every construction site disturbing ground, no matter the size, must control erosion and sediment under Bloomington Municipal Code § 13.05.040, using best management practices like silt fences, filter socks, or sedimentation basins. Bare soil left idle must start getting stabilized within seven days and finish within fourteen, and CBU inspects the measures before land-disturbing work can even begin.
(a)All project sites undergoing land disturbing activities, regardless of size, shall prevent the illicit discharge of pollutants off-site or conveyed into any stormwater drainage system, either by wind or water in accordance with the MS4GP and the CSGP. All land disturbing activities shall be protected by best management practices. Best management practices may include, but are not limited to, silt or erosion-control fences, filter socks, sedimentation basins, articulated concrete blocks, mechanically stabilized earth, storm grate filters, or erosion control mats. ... (o)Un-vegetated areas that are left idle or scheduled to be left inactive must be temporarily or permanently stabilized with measures appropriate for the season to minimize erosion potential. To meet this requirement, the following apply:(1)Stabilization must be initiated by the end of the seventh day the area is left idle. The stabilization activity must be completed within fourteen days after initiation.
Full Breakdown
040(a) requires every project site undertaking land-disturbing activity, regardless of size, to prevent pollutants from blowing or washing off-site, using BMPs such as silt or erosion-control fences, filter socks, sedimentation basins, articulated concrete blocks, mechanically stabilized earth, storm grate filters, or erosion control mats. 040(c). 040(h). 040(j). 040(o): stabilization must start by the end of the seventh idle day and be finished within fourteen days of starting, through seeding, mulch, or another temporary method appropriate for the season. 040(p). 050(b).
Violations & Fines
CBU can issue a stop work order for a § 13.05.040 violation with at least seventy-two hours' notice, or immediately if the violation creates a public health or safety hazard, under § 13.08.050. Fines follow the same schedule as other Stormwater Management Ordinance violations: up to $2,500 for a first offense and up to $7,500 for the second and any later violation, plus CBU can revoke permits or draw on a performance bond.
Frequently Asked Questions
Do small construction projects need erosion control in Bloomington?
How long can I leave bare dirt exposed on a job site?
What happens if sediment gets tracked onto a public road?
Can CBU shut down my construction site for an erosion violation?
Sources & Official References
Other rules in Bloomington
Compare Bloomington to another location·View the Indiana environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.