Brooklyn Park, MN Environmental Rules: Erosion Control (2026)
Key Facts
- Required at
- preliminary plat submission
- Minimum restored topsoil depth
- 3 inches
- Standard followed
- MPCA Best Management Practices Handbook
- Review authority
- City Engineer, Planning Commission
- City projects exempt
- no exemption
- Extra plan required in
- Mississippi River Corridor Critical Area Overlay
Summary
Every preliminary plat in the City of Brooklyn Park must address erosion and sediment control: staged construction, minimal soil exposure, three inches of restored topsoil, and compliance with the state's Best Management Practices Handbook, all subject to City Engineer and stormwater inspection.
(J) Erosion and sediment control shall be addressed as follows: (1) The development shall conform to the natural limitations presented by topography and soil so as to create the least potential for soil erosion. (2) Erosion and siltation control measures shall be coordinated with the different stages of construction. Appropriate control measures shall be installed prior to development when necessary to control erosion. ... (5) Where the topsoil is removed, sufficient topsoil shall be set aside for respreading over the developed area. Topsoil shall be restored or provided to a minimum depth of three inches and shall be of a quality at least equal to the soil quality prior to development. ... (8) Development shall comply with and follow the applicable best management practices for erosion and sedimentation control as described in the Minnesota Pollution Control Agency's (MPCA) Best Management Practices Handbook as may be amended.
Full Breakdown
026(J) requires that erosion and sediment control be addressed as part of every preliminary plat submission. Development must conform to the natural limitations of topography and soil so as to create the least potential for soil erosion, and control measures must be coordinated with each stage of construction, installed before development begins when necessary. Land must be developed in workable increments so the smallest practical area is exposed at any one time, and any exposed soil may be bare only for the shortest feasible period specified in the development agreement.
Where topsoil is stripped, it must be set aside and restored to a minimum depth of three inches at a quality at least equal to what existed before development, and natural vegetation must be protected wherever practical. Runoff must be diverted to a sedimentation basin before it reaches the natural drainage system, and every project must follow the applicable best management practices in the Minnesota Pollution Control Agency's Best Management Practices Handbook, as amended. 026(J)(10) makes clear that city-initiated or city-directed projects get no exemption from these rules. 026(H)(3): the City Engineer can require a separate erosion and sedimentation control plan for those parcels. 027.
Violations & Fines
A preliminary plat that omits the erosion and sediment control information required by § 151.026(J), or construction that departs from an approved erosion control plan, can be held up or denied at the preliminary or final plat stage, and stormwater facilities that fail city inspection under § 151.026(J)(9) will not be accepted; general Chapter 151 violations are enforceable as misdemeanors under § 10.99, with a fine of up to $1,000.
Frequently Asked Questions
Does a subdivision developer have to control erosion during construction in Brooklyn Park?
How much topsoil has to be restored after grading?
Are city road or utility projects exempt from erosion control rules?
Is there an extra requirement near the Mississippi River?
Sources & Official References
Other rules in Brooklyn Park
Compare Brooklyn Park to another location·View the Minnesota environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Hennepin County handle erosion control.