Skip to main content
CityRuleLookup

Environmental Rules in Minnesota (2026)

61 rules on the books across Minnesota, 15 cities and counties. Select a rule to read the full details.

Severity: Few Restrictions · Light Restrictions · Some Restrictions · Significant Restrictions · Heavy Restrictions

Stormwater Management

Requirements for managing rainwater runoff on your property, including retention basins, permeable surfaces, and drainage plans.

Minnesota: statewide

StatewideHeavy Restrictions

The Minnesota Pollution Control Agency administers the federal NPDES MS4 general permit under Minn. Stat. Ch. 115…

Read full rule →

Olmsted County

Significant Restrictions

Olmsted County bans dumping anything but storm water into its MS4 storm drainage system and watercourses under Chapter…

Read full rule →

Anoka County

Some Restrictions

In unincorporated Anoka County land within 1,000 feet of a lake, pond or flowage, or 300 feet of a river or stream…

Read full rule →

Carver County

Some Restrictions

Carver County requires stormwater management plans for new development to control both the rate and quality of runoff…

Read full rule →

Dakota County

Some Restrictions

Unincorporated Dakota County shoreland caps impervious surface coverage at 25% of a lot and requires new development to…

Read full rule →

Maple Grove

Some Restrictions

Projects in Maple Grove that create or fully reconstruct one acre or more of impervious surface must develop a full…

Read full rule →

Minneapolis

Some Restrictions

Disturbing more than half an acre in Minneapolis requires a city engineer-approved stormwater management plan…

Read full rule →

Rochester

Some Restrictions

Rochester regulates what may enter its municipal storm sewer system under City Code Chapter 6-4, adopted to meet…

Read full rule →

Saint Paul

Some Restrictions

Disturb more than a quarter acre in Saint Paul and trigger site plan review, or clear an acre or more for construction…

Read full rule →

St Louis County

Some Restrictions

Countywide, Section 6.19 of Zoning Ordinance 62 lets stormwater management proceed without a separate permit only if a…

Read full rule →

Stearns County

Some Restrictions

Stearns County requires a stormwater pollution prevention plan for new development in the unincorporated area that adds…

Read full rule →

Washington County

Some Restrictions

New subdivisions in Washington County cannot increase runoff: Development Code Chapter Three, Section 10.3 caps…

Read full rule →

Woodbury

Some Restrictions

Woodbury bars developing or redeveloping land for residential, commercial, industrial, or institutional use without…

Read full rule →

Erosion Control

Rules to prevent soil erosion during construction and landscaping, including required sediment barriers and ground cover standards.

Minnesota: statewide

StatewideHeavy Restrictions

MPCA's NPDES Construction Stormwater General Permit, authorized under Minn. Stat. Ch. 115, applies statewide to…

Read full rule →

Anoka County

Some Restrictions

Anoka County requires a grading and filling permit for any unincorporated shoreland work moving more than 10 cubic…

Read full rule →

Carver County

Some Restrictions

Carver County requires an erosion control permit for any construction activity of one acre or more, or smaller projects…

Read full rule →

Dakota County

Some Restrictions

Dakota County requires grading and filling on unincorporated shoreland to expose the smallest amount of bare ground for…

Read full rule →

Hennepin County

Some Restrictions

Right-of-way permit holders in Hennepin County must use Best Management Practices to control erosion, sediment, and…

Read full rule →

Maple Grove

Some Restrictions

Maple Grove requires all land-disturbing and land-filling work, including new home lot prep, to be done in a way that…

Read full rule →

Minneapolis

Some Restrictions

Minneapolis requires an erosion and sediment control permit for any land-disturbing activity that moves more than 5…

Read full rule →

Olmsted County

Some Restrictions

Olmsted County's zoning ordinance limits soil loss from construction and land clearing to five tons per acre per year…

Read full rule →

Rochester

Some Restrictions

Rochester requires a grading permit before any grading work and ties new-building permits to completed erosion and…

Read full rule →

Saint Paul

Some Restrictions

Saint Paul requires a grading permit before moving more than fifty cubic yards of fill, and every grading job must…

Read full rule →

St Louis County

Some Restrictions

Any land alteration within 300 feet of a lake or river in unincorporated St. Louis County, whether or not it needs a…

Read full rule →

Stearns County

Some Restrictions

Stearns County requires an erosion and sediment control plan before construction of a new plat, or a commercial or…

Read full rule →

Washington County

Some Restrictions

Washington County requires erosion and sediment control on construction sites under Development Code Chapter Three…

Read full rule →

Woodbury

Some Restrictions

Every site under active land disturbance in Woodbury must install and maintain erosion and sediment controls under City…

Read full rule →

Flood Zones

Building requirements for properties in FEMA flood zones, including elevation standards, flood insurance mandates, and construction limits.

Minnesota: statewide

StatewideHeavy Restrictions

Minnesota Statutes sections 103F.101 to 103F.155 require all communities with mapped flood hazard areas to adopt…

Read full rule →

Carver County

Significant Restrictions

Carver County overlays Floodway, Flood Fringe, and General Floodplain Districts on mapped land under § 152.144-152.149…

Read full rule →

Hennepin County

Significant Restrictions

Hennepin County will not permit a subsurface sewage treatment system located in a floodway, and floodplain siting must…

Read full rule →

Maple Grove

Significant Restrictions

Maple Grove restricts development inside its mapped floodway, flood fringe, and general floodplain districts to uses…

Read full rule →

Minneapolis

Significant Restrictions

Building, filling, or grading in a mapped Floodway or Flood Fringe District requires a zoning permit, and structures…

Read full rule →

St Louis County

Significant Restrictions

St. Louis County Floodplain Ordinance No. 69 requires a permit from the Director before any building, fence, pool…

Read full rule →

Stearns County

Significant Restrictions

Stearns County overlays a Floodplain Overlay District on the floodway, flood fringe and general floodplain areas of the…

Read full rule →

Washington County

Significant Restrictions

Washington County regulates development in mapped floodplains across its unincorporated areas under Development Code…

Read full rule →

Woodbury

Significant Restrictions

Woodbury's floodplain chapter applies to any land the official zoning map shows inside a floodway or flood fringe…

Read full rule →

Dakota County

Some Restrictions

Unincorporated Dakota County splits its floodplain into Floodway, Flood Fringe and General Floodplain Districts based…

Read full rule →

Olmsted County

Some Restrictions

Olmsted County participates in the FEMA National Flood Insurance Program and administers floodplain rules through…

Read full rule →

Saint Paul

Some Restrictions

Saint Paul's floodplain management overlay, Chapter 68, covers every parcel the FEMA flood insurance rate map places in…

Read full rule →

Anoka County

Few Restrictions

Anoka County has no floodplain ordinance of its own. The County Board repealed its 1980s/1990s Floodplain Management…

Read full rule →

Climate Emergency Mobilization

Local climate-emergency declarations and mobilization plans, including building electrification mandates, gas-hookup bans in new construction, and reach codes.

Flood Elevation Requirements

FEMA NFIP minimum base flood elevation (BFE) construction standards for properties in mapped flood zones, including freeboard requirements above BFE.

Carver County

Significant Restrictions

In the Flood Fringe District, Carver County requires the lowest floor of every structure, including accessory…

Read full rule →

Washington County

Significant Restrictions

In unincorporated Washington County, new and improved structures in the flood fringe must be built with their lowest…

Read full rule →

Anoka County

Some Restrictions

Where floodplain regulatory elevations don't already control, Anoka County's Shoreland Management Ordinance requires…

Read full rule →

Dakota County

Some Restrictions

In the unincorporated Flood Fringe District, Dakota County requires new structures to be built on non-settling fill…

Read full rule →

Maple Grove

Some Restrictions

Maple Grove requires new floodplain structures to sit at least one foot above the base regional flood elevation, the…

Read full rule →

Minneapolis

Some Restrictions

New and substantially improved structures in Minneapolis's Flood Fringe District must be elevated on fill so the lowest…

Read full rule →

Saint Paul

Some Restrictions

Saint Paul defines the 'regulatory flood protection elevation' as at least 2 feet above the regional (100-year) flood's…

Read full rule →

St Louis County

Some Restrictions

St. Louis County sets its Regulatory Flood Protection Elevation (RFPE) at one foot above the base flood elevation, plus…

Read full rule →

Stearns County

Some Restrictions

Stearns County requires new and substantially improved structures in the Floodplain Overlay District to sit at or above…

Read full rule →

Woodbury

Some Restrictions

Woodbury requires one foot of freeboard above the regional (100-year) flood elevation. City Code Sec. 25-6 sets the…

Read full rule →