Coon Rapids, MN Environmental Rules: Erosion Control (2026)
Key Facts
- Governing chapter
- City Code Chapter 8-1200, Surface Water Management
- Slope limit
- No disturbance on slopes of 18% or more
- Plan approval life
- Expires 1 year; one 12-month extension allowed
- Performance security
- Cash deposit or letter of credit, 150% of cost
- Reviewing body
- Community Development Department and Planning Commission
Summary
In the City of Coon Rapids, anyone applying for a building permit, subdivision approval or a grading permit for land-disturbing work must submit an Erosion Control Plan and Storm Water Management Plan to the Community Development Department under City Code Section 8-1212. Site designs must control peak flow and pollutants per the Engineering Design Guidelines, and no land-disturbing activity is allowed on slopes of 18 percent or more.
Every applicant for a building permit, subdivision approval, or permit to allow land disturbing activity shall submit an Erosion Control Plan and a Storm Water Management Plan to the City. The Erosion Control Plan and Storm Water Management Plan shall meet the submittal criteria for the plans of the City's Engineering Design Standards prior to starting construction. ... Unless determined by the City to be exempt or granted a waiver, all site designs shall establish storm water management facilities to control the peak flow rates and pollutants of storm water discharge associated with specified design storms and runoff volumes, as detailed in the City's Engineering Design Guidelines. ... No land disturbing or development activities shall be allowed on slopes of 18% or more.
Full Breakdown
Chapter 8-1200 of the Coon Rapids City Code requires every applicant for a building permit, subdivision approval, or a grading permit to allow land disturbing activities to submit a storm water management plan to the Community Development Department, and the plan cannot be approved until it meets the City's Engineering Design Guidelines and the submittal criteria of Section 8-1212. Under Section 8-1213, unless the City grants an exemption or waiver, every site design must establish storm water management facilities that control peak flow rates and pollutant loads for specified design storms, giving preference in descending order to natural on-site infiltration, vegetated swales and natural depressions, retention facilities, and finally detention facilities.
Plans go to the Planning Commission when tied to a subdivision, site plan or conditional use permit, or to the Building Inspection Division for a standalone building permit, and an approved plan expires one year after approval unless construction has started; the Community Development Department can grant one 12-month extension, and a denied extension can be appealed to the City Council within 10 days. Applicants must also post a cash deposit or letter of credit covering 150 percent of the estimated cost of the required improvements as a performance security.
Section 8-1216 separately bars any land disturbing or development activity on slopes of 18 percent or more, and Section 8-1215 forbids draining or filling wetlands unless the loss is replaced with an equal public value under the Wetland Conservation Act of 1991. The Chapter is adopted under Minnesota Statutes Section 462.351 and incorporates the Minnesota Wetland Conservation Act and the NPDES general construction permit by reference; it exempts subdivisions and building permits already approved before the Chapter's effective date.
Violations & Fines
Building, subdivision or grading permits cannot be issued until an Erosion Control Plan and Storm Water Management Plan meeting Section 8-1212 is approved, and disturbing land on a slope of 18 percent or more under Section 8-1216 violates the Chapter outright. The City can condition, deny or revoke plan approval, require a 150 percent cash deposit or letter of credit as performance security, and an expired one-year approval with no extension granted stops construction until a new plan is filed.
Frequently Asked Questions
Does Coon Rapids require an erosion control plan before construction?
Can you build on a steep slope in Coon Rapids?
How long is a Coon Rapids storm water management plan approval good for?
Sources & Official References
Other rules in Coon Rapids
Compare Coon Rapids to another location·View the Minnesota environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.