Woodbury, MN Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Sediment removal deadline
24 hours once device is 1/3 full
Nonfunctional device repair
Within 24 hours of discovery
Sediment basin maintenance
Within 72 hours at half capacity
Inspection frequency
Weekly, plus after 0.5-inch rain events
Governing chapter
Chapter 7, Land Disturbance Ordinance

Summary

Every site under active land disturbance in Woodbury must install and maintain erosion and sediment controls under City Code Sec. 7-14, with a 24-hour deadline to clear sediment buildup or fix nonfunctional devices, and weekly plus post-rainfall inspections required under Sec. 7-15.

(b)Erosion and sediment control. Temporary and permanent erosion and sediment control measures shall be installed on all sites as necessary to prevent erosion and sedimentation from impacting any adjacent property, rights-of-way, drainage system, lake, pond, wetland, watercourse, natural resource or other protected area....At minimum, storm water pollution prevention plan items shall be maintained as follows:(1)If a perimeter erosion control device is found to have sediment accumulation in excess of one third of the total device height, the sediment shall be removed within 24 hours of discovery.(2)If an erosion control device is found to be nonfunctional, it shall be repaired or replaced within 24 hours of discovery.(3)Temporary sediment basins shall be maintained when sediment reaches one half the outlet height or one half the storage volume within 72 hours after discovery.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 48).

Full Breakdown

Section 7-14 requires temporary and permanent erosion and sediment control measures on all sites with land disturbing activity, sized to prevent erosion or sedimentation from reaching adjacent property, rights-of-way, drainage systems, lakes, ponds, wetlands or other protected areas. Controls must be operational before any land disturbing work starts, following the site's storm water pollution prevention plan. Maintenance deadlines are specific: if a perimeter control device such as a silt fence accumulates sediment beyond one-third of its height, the sediment must be removed within 24 hours of discovery; a nonfunctional device must be repaired or replaced within 24 hours; and a temporary sediment basin must be serviced once sediment reaches half the outlet height or half the storage volume, within 72 hours.

5 inches or more in 24 hours, logging the date, inspector, findings, corrective actions and rainfall amounts. The city itself may inspect any land disturbing site at any stage under Sec. 7-4 and 7-15(a) to confirm chapter 7 compliance.

Violations & Fines

Failing to install operational erosion and sediment controls before work begins, or missing the 24-hour and 72-hour maintenance deadlines in Sec. 7-14(e), is a chapter 7 violation; conviction is a misdemeanor under Sec. 7-17 with a fine or jail time set by state statute, and the city can also draw on the project's financial security under Sec. 7-8 to fund corrective work and suspend or revoke the land disturbance permit.

Frequently Asked Questions

What erosion controls does Woodbury require during construction?
Sec. 7-14(b) requires temporary and permanent erosion and sediment control measures on every site with land disturbing activity, installed under the project's storm water pollution prevention plan before work begins.
How often must a construction site be inspected for erosion control?
Section 7-15(c)(5) requires inspections at least weekly and again within 24 hours after any rainfall event of 0.5 inches or more, with written reports on findings and corrective actions.
What happens if sediment builds up behind a silt fence?
Under Sec. 7-14(e)(1), sediment exceeding one-third of the control device's height must be removed within 24 hours of discovery, and a nonfunctional device must be repaired or replaced within the same 24-hour window.

Sources & Official References

Other rules in Woodbury

All Woodbury rules

Compare Woodbury to another location·View the Minnesota environmental rules overview

Get notified when Erosion Control in Woodbury, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.