Woodbury, MN Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Volume capture requirement
first 1.1 inches of runoff
Infiltration drain time
within 48 hours
Sediment removal standard
90% of TSS annually
Storm events for rate control
2-, 10-, 100-year events
Exempt plats
3 lots or fewer
Exempt zoning district
any project in R-2

Summary

Woodbury bars developing or redeveloping land for residential, commercial, industrial, or institutional use without stormwater controls that manage runoff. City Code Sec. 27-27 requires capturing the first 1.1 inches of runoff on site, on top of whatever rules the project's underlying watershed district imposes.

(a)Applicability. No person shall develop or redevelop land for residential, commercial, industrial, or institutional uses without having provided stormwater management measures that control or manage runoff from such developments unless specifically exempted below. The city is within the boundaries of three watershed districts. Project proposers shall be responsible for meeting the stormwater management rules of the underlying watershed district in addition to the requirements below.... (d)Volume management. Volume management for new development shall meet the following:(1)The required volume reduction is the first 1.1 inches of runoff over the development site's impervious surface.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 48).

Full Breakdown

Sec. 27-27(a) sets Woodbury's core stormwater rule: no one may develop or redevelop land for residential, commercial, industrial, or institutional use without stormwater management measures that control runoff, unless a specific exemption applies. Because the city sits inside three separate watershed districts, project proposers must also meet that district's stormwater rules on top of the city's own standards, and submittals under the subdivision (chapter 21) and zoning (chapter 24) codes must show compliance. The volume standard in Sec. 5 feet for subsurface BMPs) and required soil borings.

Infiltration is flatly prohibited near contaminated sites, vehicle fueling areas, wellhead emergency response areas, and locations with less than three vertical feet of separation to bedrock or seasonal groundwater (subsection (d)(7)). Sediment control under subsection (f) requires removing 90 percent of the post-development total suspended solids load annually before discharge to natural waters, and rate control under subsection (h) must maintain or reduce predevelopment peak runoff for the 2-year, 10-year, and 100-year 24-hour storms using Atlas 14 rainfall data. Subsection (k) exempts small residential plats of three lots or fewer, single-family redevelopment on one platted lot, redevelopment disturbing under an acre with less than 6,000 square feet of new impervious surface, and any project in the R-2 zoning district from the volume management rules, though they may still owe the other standards on review.

Violations & Fines

Developing land without the stormwater measures Sec. 27-27 requires, or an infiltration BMP sited in a prohibited area under subsection (d)(7), blocks city approval of the site plan or subdivision submittal. Sec. 27-28 backs enforcement citywide: the city can inspect any site, seek a search warrant if access is refused, and suspend a property's storm sewer connection without notice to stop an actual or threatened illicit discharge.

Frequently Asked Questions

Does every new home need a stormwater plan in Woodbury?
Not necessarily. Sec. 27-27(k) exempts new development creating a residential plat of three lots or less, and any new development or redevelopment in the R-2 zoning district, from the volume management standards.
How much runoff volume must a new development capture on site?
Sec. 27-27(d)(1) requires infiltration or filtration of the first 1.1 inches of runoff over the site's new impervious surface, using BMPs sized to drain within 48 hours.
What sediment removal standard applies to stormwater discharge?
Sec. 27-27(f) requires stormwater to be treated to remove 90 percent of the post-development total suspended solids load annually before it reaches natural surface waters.
Who enforces Woodbury's stormwater rules besides the city?
Sec. 27-27(a) makes project proposers separately responsible for the rules of Woodbury's underlying watershed district, since the city sits within three watershed districts.

Sources & Official References

Other rules in Woodbury

All Woodbury rules

Compare Woodbury to another location·View the Minnesota environmental rules overview

Get notified when Stormwater Management in Woodbury, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.