Washington County, MN Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing section
Development Code Chapter Three, Section 10.3
Peak discharge standard
No increase for 2-, 10-, 100-year storms
Runoff rate rule
Post-development rate cannot exceed pre-development
Preferred method
Natural infiltration before engineered ponding
Shoreland cross-reference
Chapter Six, Section 10.1 applies same standard
Effective date
June 5, 2018

Summary

New subdivisions in Washington County cannot increase runoff: Development Code Chapter Three, Section 10.3 caps post-development peak discharge at pre-development rates for the 2-year, 10-year and 100-year storms. Applicants must install a drainage system, dedicate easements, and prioritize natural infiltration before engineered ponds, and the same standard governs the Shoreland Management Overlay District by cross-reference.

These county ordinances apply to unincorporated areas of Washington County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Storm Water Drainage.

(4) The rate of surface runoff within the boundaries of a proposed subdivision shall not, in any event, be greater than the rate of runoff existing on the proposed subdivision prior to the proposed development... (6) An applicant shall install or construct, on or for the proposed land disturbing or development activity, all storm water management facilities necessary to manage increased runoff so that the 2-year, 10-year and 100-year storm peak discharge rates existing before the proposed development are not increased and accelerated channel erosion will not occur as a result of the proposed land disturbing or development activity.

Full Breakdown

3, Storm Water Drainage. Every proposed subdivision must include a drainage system, whether a storm sewer, open ditches, culverts, pipes and catch basins, or a combination, with easements dedicated to carry surface water; drainage way easements or land dedication must be provided when needed for flood plain management, erosion prevention, or public access to water bodies. The rate of surface runoff leaving the subdivision 'shall not, in any event, be greater than the rate of runoff existing on the proposed subdivision prior to the proposed development,' and the county can regulate the volume of runoff if downstream properties or water resources would otherwise be unreasonably interfered with.

3(6) goes further for peak flows: an applicant must install all stormwater management facilities necessary so that the 2-year, 10-year and 100-year storm peak discharge rates existing before development are not increased and so that accelerated channel erosion does not result. The code sets a preference order for how to get there, starting with natural infiltration, maximizing vegetated area and minimizing impervious surface, before turning to engineered ponding facilities that must handle both permanent and temporary storage. 3 for any activity within the Shoreland Management Overlay District, so lakeshore and riverfront development is held to the identical runoff and peak-discharge limits.

Violations & Fines

A subdivision plan that raises post-development peak discharge above the pre-development 2-year, 10-year or 100-year storm rates, or that fails to provide the required drainage system and easements, does not satisfy Section 10.3 and will not clear preliminary plat review. The same standard applies to shoreland development by cross-reference in Chapter Six, Section 10.1, so lakeshore projects face identical stormwater conditions before a permit issues.

Frequently Asked Questions

Does Washington County, MN require stormwater management for new subdivisions?
Yes. Development Code Section 10.3 requires every proposed subdivision to install a drainage system, whether storm sewer, ditches, culverts or ponding, and to keep the rate of surface runoff leaving the site at or below what existed before development. Applicants must also address 2-year, 10-year and 100-year storm peak discharge rates.
What stormwater method does Washington County prefer for new development?
Section 10.3(8) directs applicants to investigate stormwater practices in descending order of preference, starting with natural infiltration on-site: maximizing vegetated area, minimizing impervious surfaces, and directing runoff to vegetation rather than streets or storm sewers, before relying on engineered ponding facilities.
Do the subdivision stormwater rules apply to shoreland lots too?
Yes. Chapter Six, Section 10.1 of the Development Code states that the stormwater standards in Chapter Three, Section 10.3 apply within the Shoreland Management Overlay District, so lakeshore and riverfront parcels are held to the same runoff and peak-discharge limits as any other subdivision.

Sources & Official References

Other rules in Washington County

All Washington County rules

Compare Washington County to another location·View the Minnesota environmental rules overview

Get notified when Stormwater Management in Washington County, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.