Brooklyn Park, MN Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Governing section
- § 152.801(D) Flood Hazard Overlay
- Regulatory flood protection elevation
- 2 ft above regional flood
- Fill extent required
- 15 ft beyond structure, min 1 ft below elevation
- Fill cap
- 1,000 cubic yards (Flood Fringe)
- Residential basements
- § 152.1016, same elevation standard
- Accessory structure floodproofing alt
- under 576 sq ft, FP3/FP4
Summary
Brooklyn Park's Flood Hazard Overlay requires every structure in the Flood Fringe District, including accessory buildings, to be elevated on fill so the lowest floor sits at or above the regulatory flood protection elevation, defined as two feet above the regional flood elevation. Section 152.1016 applies the same standard to residential basement construction citywide.
§ 152.801 FLOOD HAZARD OVERLAY. ... (D) Floodway, Flood Fringe, and General Flood Plain performance standards and uses. ... (4) Flood Fringe District (FF). ... (b) Standards for Flood Fringe permitted uses. ... All structures, including accessory structures, must be elevated on fill so that the lowest floor, as defined, is at or above the regulatory flood protection elevation. The finished fill elevation for structures must be no lower than one foot below the regulatory flood protection elevation and the fill must extend at the same elevation at least 15 feet beyond the outside limits of the structure.
Full Breakdown
801(D). 105 as an elevation no lower than two feet above the regional flood, plus any rise caused by floodway encroachments, essentially a two-foot freeboard above the 100-year flood. 801(D)(4)(b)1 requires that all structures, including accessory structures, be elevated on fill so the lowest floor sits at or above that regulatory flood protection elevation, with finished fill no lower than one foot below the regulatory elevation and extending at least 15 feet beyond the structure's outside limits. Accessory structures under 576 square feet used only for parking or storage may instead be floodproofed to FP3 or FP4 State Building Code classifications rather than filled, provided utilities are water-tight or elevated, materials resist flood damage, and the structure carries at least two automatic flood-venting openings sized to one square inch per square foot of enclosed floor area.
Fill placement on a Flood Fringe parcel is capped at 1,000 cubic yards unless it is elevating a structure or approved as a conditional use. 608 for nonresidential basement standards. 801(D)(2).
Violations & Fines
Building below the regulatory flood protection elevation without an approved floodproofing design is enforced through the zoning permit process; a structure that cannot show compliance is denied a building or grading permit. Beyond permit denial, a violation of the code falls under the citywide general penalty at § 10.99: a misdemeanor with up to 90 days in jail and a $1,000 fine, or a petty misdemeanor carrying a $300 fine, with each day of an unpermitted or noncompliant structure a separate offense.
Frequently Asked Questions
How high above flood level must a home be built in Brooklyn Park?
Can I build a basement in the Flood Fringe District?
Is there a limit on how much fill I can add to raise my lot?
Sources & Official References
Other rules in Brooklyn Park
Compare Brooklyn Park to another location·View the Minnesota environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in Hennepin County handle flood elevation requirements.