Duluth, MN Environmental Rules: Erosion Control (2026)
Key Facts
- Trigger
- Any land-disturbing activity in shoreland
- Detailed-plan threshold
- Over 250 sq ft or 10 cu yd
- Plan elements
- Erosion control, stormwater, buffer restoration
- Vegetation removal
- Contiguous clearing in shore zone banned
Summary
Any land-disturbing activity inside a Duluth shoreland triggers a mandatory erosion and sediment control requirement, and grading or filling above 250 square feet or ten cubic yards in the shore impact zone needs a city-approved erosion control, stormwater management and buffer restoration plan before work starts.
(a) Erosion and sediment control measures shall be required for any land disturbing activity; (b) Grading and filling of more than 250 square feet or placement of more than ten cubic yards of material within the shore impact zone shall only be permitted if a plan for erosion control, stormwater management and shoreline buffer restoration is approved by the city and effectively implemented;
Full Breakdown
D of the Natural Resources Overlay require a shoreland permit for structures, grading, filling, excavating, new impervious surfaces and removal of natural vegetation within 1,000 feet of Lake Superior or 300 feet of rivers, creeks, streams and tributaries. Once that permit is in play, erosion and sediment control measures are required for any land-disturbing activity in the shoreland, with no minimum size trigger on that baseline rule. A second, more detailed requirement kicks in above a specific threshold: grading or filling of more than 250 square feet, or placing more than ten cubic yards of material within the shore impact zone, is only permitted if the applicant has an approved plan covering erosion control, stormwater management and shoreline buffer restoration, and that plan has to be effectively implemented, not just approved on paper.
Impervious surfaces must be designed to minimize and control runoff and erosion into regulated waters, and removing natural vegetation has to be designed to prevent erosion into those waters while preserving shoreland aesthetics. Removing trees or shrubs in a contiguous patch, strip, row or block inside the shore impact zone is prohibited outright, and any vegetation buffer disturbed by a project must be restored to the extent feasible once construction wraps up.
Violations & Fines
Land-disturbing work in the shoreland without the required erosion control measures, or grading and filling above the 250-square-foot/ten-cubic-yard threshold without an approved and implemented erosion, stormwater and buffer restoration plan, does not qualify for the shoreland permit required under Section 50-18.1.D and can be halted and required to be corrected under the Overlay's enforcement provisions.
Frequently Asked Questions
Do I need an erosion control plan for shoreland grading in Duluth?
Can I clear-cut trees near the shoreline in Duluth?
What counts as the shore impact zone in Duluth?
Sources & Official References
Other rules in Duluth
Compare Duluth to another location·View the Minnesota environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.